PAY ESTIMATE NO. 8
<br />8UNWOOD DR ;VE NiW; AND RHIHESTONE STREET NW
<br />
<br />ENGINEER
<br />
<br />Bid Schedule "B" - Ramsay Local Funding Sunwood Drive NWCon~nued
<br />
<br />ITEM ITEM QTY UNIT UNIT COST CONTRACT USED TO- EXTENSION
<br />NO. AMOUNT DATE
<br />
<br /> 155 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 34 LF S144.02 LF $4,896.68 34 $4,890.68
<br />
<br /> 156 CONSTRUCT DRAINAGE STRU, CTU.P-J~ DESIGN 60 -14020 '6 LF $186.50 LF $1,119.00 6 $'~f119.00,
<br />
<br /> 157 CASTINGASSEMBLIES B-17 IS EACH $564.45 EACH $8,466[75 16 $9,031.21~
<br /> 158 CONSTRUCT DRAINAGESTRUCTURE DESIGN N-4003 5 EACH $318.59 EACH $1,592.95 $0.00~
<br /> 159 CONSTRUCT SANITARY MANHOLE- 48 i0-g') , i5 , EAcH $2,056.12 EACH $30,841.80 12 $24,673.44'
<br /> 160 CONSTRUCTSANI,TARY MANHOLE- 54 (0-~). ) ~ 5 EACH $2,618.03 EACH $13,090.15 0 $0.00
<br />
<br /> " 4 EAcH $2,745.83 EACH $10,983.32 21 $57,602.431
<br /> 161 CONSTRUCT SANITARY MANHOLE:- 60/0-8')
<br /> 162 EXTRA DEPTH MA.NHOLE (OVER 8") 48 ~ 100 - LF~ $85.20 LF $,8,520.00 65.1 $5,546.52~
<br />
<br /> 163 ~XTRA DEPTH MANHOLE (OVER 8"1 54 30 LF $133.13 LF $3,993.90 ' 20 $2,602.60
<br />
<br /> 164 EXTR.A DEPTH MANHOLE (OVER 8"~} 60 22 LF' $149.10 LF $3,280.20 61.9 $9,229,2~
<br />
<br /> 165 4" CONCRETE WALK 15600 SF $2.01 SF $11,2~6.00 5040 $10,130.401
<br />
<br /> ~66 CONCRETE CURB A. ND. GUTTER DF~IGN lM24 5475 LF $8.94 LF 5;48,946.50 5367 $47~.080.08~
<br />
<br /> 167 SIGN PANELS TYPEC 37.5: SF $22.19 SF $832.13 37.5 $832.13'
<br />
<br /> 168 TYPE Ill EARRIDADE : 8 EACH $309.60 EACH $2,476.80 $0.00~
<br />
<br /> 169 PAVE.MENT MESSAGE {RIGHT ARRQW) POLY PREFORMED 3 EACH $309.60 EACH $928.80 3 $928.80
<br /> 170 PAVEM. ENTMESSAGE ~LEF.~I'ARROW,) POLY PREFO~ ,R~MED 3 EACH $309.60 EACH $928.80 3 $928.80
<br /> ?
<br /> 17 [ PA. VEMENT MESSAGE (ONL_Y) POLY PREFORMED 2. EAC. H $387.00 EACH $774.00 $0.012
<br />
<br /> 172 4" SOLID LINE WHI.TE- EPOXY 6500 LF $0.50 LF $3,250.00 6417 $3,208.501
<br />
<br /> 173 4" BROKEN LINE WHITE- EPOXY . - ~150 LF $0.50 LF $75.00 150 $75.00~
<br /> 174 4" DOUBLE SOLID LiNE YELLOW - El>OXY 1380 LF $1.01. LF $1,363.50 2159 $2,180,59~
<br /> 175 24" SOLIO LINE, YELLO..W- EPOXY :, .500 LI: $5.68 LF $2,840.00 I' $0.00
<br /> 176 SEEDING ~ 1.0 ACRE $258.00 ACRE $258.00 $0.00
<br /> 177 SODDING, TYPE LAWN : 1250 SY $2.48 SY $3,100.00 1250 $3,100.00
<br /> 178 SEED MIXTURE 2617 , . ilO0 LB $2.63 LB $263.00 $0.00
<br />
<br /> [79 MULCH MATERIAL TYPE3 . ~ 2 TON $154.80 TON $309.60 $0.00
<br />
<br /> ~00 sY Sl,55 sY $310.00 $0.00
<br /> [80 EROSION CONTROL BLANKETS CATE, GORY3
<br /> 181 COMMERCIAL FERTILIZERANALYSIB 24-2-2,.4 ,100 LBS $0.36 LBS $144.00 $0.00
<br />
<br />Total Bid Schedule "B' SI,631,033.54 $1,579,838.99
<br />
<br />G;/Share d Docs/M u nicipai/AR amsey/
<br />3171/ra3171paPAY ESTIMATE NO. 8
<br />
<br />PE-6