Laserfiche WebLink
8UNWOOD DRI' ~N.W. iAND RHINESTONE STREET NW <br /> <br />ENGINEER <br /> <br />Bid Schedule "C" - $.A.P. 199-10~-01 - Rhineslone Street NW Continued <br /> <br />ITEM ITEM i QTY , UNIT UNIT COST CONTRACT USED "fO- EXTENSION <br />NO. ' AMOUNT DATE <br /> <br /> 245 !BALECHECK 50 EACH $11.87 EACH $593.50 $0.00 <br /> 246 SILT FENCETYPE MACHINE SLICED 300 . LF $1.81 LF $543.00 $0.00 <br /> <br /> 247 tEMPORARY CONSTRUCTION ROC,K ENTRAN, CE ~. I BACH $2,412.51 EACH $2,4t2.51 [ $2,'412.51 <br /> 248 ISEEDING i ; 1.3 ACRE l- $258.00 ACRE $335.40 $0.00 <br /> 249 ISODDING, TYPE LAWN :.3700: I SY $2.48 SY $9,176.00 $0.00 <br /> 250 ISEED MIXTURE 260 130 LB $2.63 LB $341.90 $0.00 <br /> 251 IMuLcH MATERIAL TYP.E3. : 2,6 r TON $154.80 TON $402.48 $0.00 <br /> <br /> 252 EROSION CONTROL BLANKETS CATEGORY 3 : : 100 SY $2.32 SY $232.00 $0.00 <br /> <br /> 253 :OMMERCIAL FERTILIZER ANALYgIS 24-2-24 - 520 LBS $0.36 LBS $187.20 $0,00 <br /> <br />Total Bid Schedule "C" ' $600,056.05 $401,291.47 <br /> <br />Bid Schedule "D" - Rhinestone Street NW Local Funding <br /> <br />ITEM ITEM QTY UNIT UNIT COST CONTRACT USED TO- EXTENSION <br />NO. AMOUNT DATE <br /> <br /> 254 REMOVE BITUMINOUS PAVEMENT lO0 SY $5.72 SY $572.00 191 $1,092.52 <br /> <br /> 255 SAWING BI'I'I./MINOUS PAVEMENT (FULL DEPTH) 400 LF $0.93 LF $372.00 860 $799.80 <br /> <br /> EXCAVATION,. EV - 12.00 CY $3.20 CY $640.00 200 $640.00 <br /> 256 <br /> COMMON <br /> <br /> 257 SALVAGED TOPSOIL FROM STOCKPILE, SV ~100 CY $6.60 CY $660.00 $0.00 <br /> <br /> 258 AGGREGATE BASECLASS'5 MODIFIED ' :100 TON $9.79 TON $979.00 139 $1,360.8'1 <br /> <br /> 259 TYPE MV3 WEARING COURSE MIXTDRE 50 TON $37.00 TON $1.850.00 50 ~'1,850.00 <br /> <br /> 260 [5" RC SAFETY APRON 2 EACH $48,7.~34 EACH $974.68 $0.00 <br /> 261 4" DUCTILE IRON PIPE CLASS 53 200 LF $11.35 LF $2.270.00 189 $2,'145.15 <br /> <br /> 262 6" DUCTILE IRON PiPE CLASS 53 100 LF $11.73 LF $I,173.00 95 $1,114.35 <br /> <br /> 263, ,g" I~UGTILE IRON PIPECLASS 52 640 LF, $14,73 LF $9,427.20 552 $8,'130.96 <br /> <br /> 264 12" DUCT1LE IRON PIPE CLASS 52 , : 2~00 : .LF $21.77 LF $58,779.00 2411 $52,487.47 <br /> <br /> 265 8" SDR 26 PVC PIPE (10-12') 120 LF $9.33 LF $1.119.60 186 $1,735.38 <br /> <br /> 266 !8,' S~DR 26 PVC PIPE(12-14') 95 I' LF $9.68 L,.F $919.60 95 $919.60 <br /> <br /> 267 8" SDR 26 I)VC PIPE (14-16') , . =40 i LF $10.52 LF $420.80 40 $420.80 <br /> <br /> 268 12" SDR 26 I'VC PIPE (10-12') 401 LF $14.10 LF $5,654.10 401 <br /> <br /> 269 12" SDR 26 PVC PIPE ( 12-[4'} 35 L? $14.46 LF $795.3C $0.00 <br /> <br /> 270 21" SDR 26 PVC PIPE (10-12'} 240 LF $55.36 LF $13,286.40 217 $'1.2,013.'12 <br /> <br /> 760 LF $55.81 LF $42,415.6C 760 $42.415.60 <br /> 271 21" SDR 26 PVC PIPE (12-14') ., <br /> <br />G:lSharedDocslMunicipal/ARamsoyl <br />3~71/ra3171pePAY ESTIMATE NO, a <br /> <br />PE-9 <br /> <br /> <br />