PAY ESTIMATE NO. 8 ENGINEER
<br /> 5UNWOOD DRIVE N.W. AND RHINESTONE STREET NW
<br />
<br />Change Order No. 4
<br />
<br /> ITEM ITEM QT¥ UNIT UNIT cost CONTRACT USED TO- EXTENSION
<br /> NO. AMOUNT DATE
<br /> I 72" RC PIPE SEWER DF. SIGN 3006 CL3 104 LF $ 162.26 i LF $ 16,875.04104 $16,875.04
<br /> 2 36" RC PIPE SEWER DESIGN 3006 CL, 3 : 94 LF $ 46.60 LF $ 4,380.40 94 $4,380.40
<br />
<br /> 3 65" SPAN RC PIPE - ARCH CL I IA 113 L,F $ 125.'00 LF $.,. 14,125.00 113 $14,125.00
<br />
<br /> 4 73" SPAN RC PIPE- ARCH CL I IA ~ 397 LF $ 134.11 LF $ 51,900.57 387 $51,900.57
<br /> 5 36" RC PIPE PLUG . ' 'l EACH $ ,75.00 EACH 5;., 75.00 I $75.00
<br /> 6 24" RC PIPE PLUG : i EACH $ 45.00 BACH $ 45.00 I $45.00
<br /> 7 72" RCP PIPE PLUG ~ i BACH $ 300.00 EACH $ 300.00 $0.00
<br /> 8 65" SPAN ARCH PLUG I EACH $ 325.00 BAcH $ 325.00 I $325.00
<br /> 9.08 LF $ 320.28 LF $ 2,908.14 9.08
<br /> 9 CONST. DRAIN. STRUCT. 72-4020 $2,908.14
<br />
<br /> 10 CONST. DRAIN. STRUCT 102~4020 8.4J LF $ 700.00 LF $ 5,887.00 7.47 $5,229.00
<br /> I l CONST. DRAIN. STRUCT 120-4020 I 1.7i LF $ 1,032.36 LF $ 12,08&94 l LTl $12,088.94
<br />
<br /> 12 CASTING ASSEMBLY A-70 I BAcH $ 546.13 EACH $ 546.13 I $546.13
<br />
<br /> 13 [5" RC PIPE SEWER DESION 3006 CL 5 .-70 LF $ 15.62 LF $ · (1,093.40) $0.00
<br /> 14 18" RC PIPE SEWER DESIGN 3006 CL 3 ] ,10g LF $ 17.54 LF $ (1,894.32) $0.00
<br />
<br /> 15 21" RC P[PE SEWER DESIGN 3006 CL 3 ' -138 LF $ 20.06 LF $ (2,768.28) $0.00
<br /> 16 24" RC PIPE SEWER DESIGN 3006 CL 3 '266] LF $ 22.00 LF $ (5,852.00) $0.00
<br /> 17 60" RC PIPE SEWER DESIGN 3006 CL 3 ~68 LF $ [ 13.45 LF $ (7,714.60) $0.00
<br /> 18 42" RC PIPE SEWER DESIGN 30.05 C.L 3_ ~ -!201 Ll~ $ 63.91 LF $ (7,669.20) $0.00
<br /> t9 CONST. DI~IN. STRUCT. 48-4020 ~13.65: LF $ 162.69 LF $ (2,220.72) $0.00
<br />
<br />20 CONST. DRAIN. STRUCT. 108-402,0 , -0.92 LF, $ 72g, 15 LF $ (669.90) $0.00
<br />
<br />21 42" PIPE PLUG -I EACH $ - 100.00 EACH $ ({00.00) $0.00
<br />
<br />22 73" SPAN ARCII PLUG :,lEACH $ 400.00EACH $ (400.00) $0.00
<br />
<br />1'oral Change Order tt4
<br />
<br />SUMMARY OF PROJECT
<br />
<br />$ 79,073.80 $108.49&22
<br />
<br /> $1,951,654.92 $1,647,117.02
<br /> $1,631,033.54 $1,579,838.99
<br /> $600,056.05 $401,291.47
<br /> $302,999.21 $253,337.02
<br /> $202,922.21 S165,894.05
<br /> $16,847.20 $16,847.20
<br /> $22,484.80 $0.00
<br /> .$79,073.80 $108,498.22
<br /> $4,807,071.73
<br />
<br />Bid Schedule "A" - SAP 199-104--107 - Sunwoad Drive
<br />
<br />Bid Schedule 'B' - Smiwood Drive NW RAmsey Local Funding
<br />Bid Schedule "C" -SAP 199-109-01 - Rhinea{one Stree!
<br />
<br />Bid Schedule "D" - Rhin~tone Street NW Ramae~' Local Funding
<br />Bid Schedule "E" - Mobilization, Traffic Control and Field OIfic~
<br />Change Order No, 1
<br />Change Order No, $
<br />Change Order No. 4
<br />
<br /> TOTAL CONTRACT AMOUNT
<br />