Laserfiche WebLink
Ramsey Blvd. These signals are included in the City Phase I improvements of <br />the Master Development Agreement. <br /> <br />Drainage to the project will be provided by constructing pOnding areas between <br />East Ramsey Parkways Northland South, in the southeast corner of the Ramsey <br />Town Center and the south,/est Corner of the Ramsey T.own Center. It is the <br />Developer's responsibility to Construct these ponding areas and construct the <br />storm sewer:from the ponding areas to the right-of-ways of Sunwood Drive and <br />Rhinestone :Street. The ultimate plan requires the Developer to construct <br />additional ponding areas south of the railroad and TH 10 and connect all Ponding <br />areas including constructing a~h outfali to the Mississippi River. <br /> <br />The City's Phase I storm drainage improvements consist of storm sewer <br />constructed within the right-of-Ways of Sunwood Drive and-Rhinestone Street. <br /> <br />See "EXHIBITS A and B" for the lo. cation of the proposed street and storm <br />drainage improvements. ~' <br /> <br />B. Water SyStem <br /> <br />The proposed water system improvements will provide a minimum 8" water main <br />with the connection of larger trunk lines in accordance with the City's master <br />plan. All mains will be DIP. Fire hydrant spacing will be approximately 300 to <br />400 feet. Eight-inch: service connections will be provided for all proposed <br />commercial lots along Sunwood Drive and Rhinestone Street. In addition to the <br />8-inct~"service line, 4-inch lines, will be provided for irrigation. <br /> <br />See "EXHIBIT C" for detailed description of the proposed water system <br />improvements. <br /> <br />C. SanitarY Sewer System <br /> <br />It is proposed to extend trunk; sanitary sewer ' along Sunwood Drive and <br />Rhinestone Street to serVe the Ramsey Town Center. <br /> <br />All proposed ;sanitary sewer lines will be 8 - 30" PVC pipe with manhole spacing <br />at 400-feet maximum. The:depth of the sanitary sewers will be between 10 to 22 <br />feet constructed at minimum grades.: Eight-inch service lines were included for all <br />commercial lots to be built on i.n the future. <br /> <br />In addition to the Ramsey ToWn Center, the 21-inch line in Rhinestone will <br />connect to the Ramsey Tow~ Center Gardens and the 30-inch trunk line in <br />Sunwood Drive will be extended west across Armstrong Boulevard. An 18" trunk <br />sewer line will extend south across TH 10 at Armstrong Boulevard. <br /> <br />See "EXHIBIT D" for detailed description of the proposed sanitary sewer system <br />improvements. <br /> <br />Page 4 <br />G'\Municipa~W, ramsey\3171\RA3171FsR,doc <br /> <br /> <br />