My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 04/18/2018
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2010 - 2019
>
2018
>
Minutes - Public Works Committee - 04/18/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:11:25 PM
Creation date
6/20/2018 9:01:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
04/18/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. COMMITTEE BUSINESS <br /> <br />5.01: Consider Using Soil from COR Infiltration Basin Project as Fill in Other Areas of <br />the COR <br /> <br />Civil Engineer IV Linton stated that preparation of plans for the COR Infiltration Basin <br />Improvement was approved by the City Council on April 9, 2018 and noted that the project will <br />generate approximately 35,000 cubic yards of soil that needs to be exported. He reported that <br />The COR was master planned as Ramsey Town Center and the developer completed grading on <br />the sites generally east of Rhinestone Street and north of East Ramsey Parkways before going <br />out of business and walking away from the project. He noted that there have been several <br />analyses of the site to determine the amount of fill required to bring the site to grade and ready <br />for construction. He noted that the general number is 200,000 cubic yards of fill will be required <br />to bring the pads up to grade and ready for building. <br /> <br />Civil Engineer IV Linton stated that it would be feasible to issue a contract for the following <br />work on select sites to use the excess fill from the COR Infiltration Basin Improvement Project: <br /> <br />1.Install silt fence. <br /> <br />2.Strip and stockpile the existing topsoil. <br /> <br />3.Spread the fill material in uniform lifts and compact. <br /> <br />4.Have a geotechnical engineer perform compaction tests and document the location and <br />results of the tests. <br /> <br />5.Replace the topsoil. <br /> <br />6.Establish vegetation. <br /> <br />Civil Engineer IV Linton stated that the area south of Sunwood Drive and east of Zeolite Street <br />was identified as a potential site for the excess fill and will take approximately 6,000 cubic yards. <br />He stated that bringing the site to grade will address a concern raised by the Minnesota <br />Department of Health about the area around the municipal well being depressed and holding <br />water and will also make the site more marketable. He stated that the remainder of the fill will <br />be placed in another area of the COR that needs fill using the same steps. He identified other <br />site, and the regional pond site. He stated that it would be feasible to add this work to the COR <br />Infiltration Basin Improvement Project and the funding sources for each line item would be <br />provided to finance in advance, so each pay estimate would draw from the correct fund. He <br />recommended amending the plans for the COR Infiltration Basin Improvements, Improvement <br />Project #18-09, to include placing the fill in a controlled and documented manner on selected <br />sites in the COR. <br /> <br />Councilmember Kuzma asked if the fill could be sold to Affinity. <br /> <br />Civil Engineer IV Linton stated that Affinity will be ready for fill prior to the City having the fill <br />available and therefore that timing would not align. <br /> <br />Motion by Councilmember Kuzma, seconded by Councilmember Johns, to recommend that the <br />City Council orders amending the plans for The COR Infiltration Basin Improvements, <br />Public Works Committee / April 18, 2018 <br />Page 2 of 6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.