My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Parks and Recreation Commission - 03/08/2018
Ramsey
>
Public
>
Minutes
>
Parks and Recreation Commission
>
2018
>
Minutes - Parks and Recreation Commission - 03/08/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:41:00 AM
Creation date
6/20/2018 11:09:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Parks and Recreation Commission
Document Date
03/08/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
million).Tonight, the purpose is to provide an update on concept-level park planning as it moves <br />into schematic design to be sure the Park and Rec Commission concurs these are the best ideas. <br /> <br />Mr. Riverblood presented several slides showing aerial, overhead, and street level views of both <br />the Municipal Plaza and the proposed Water-Centric Park. He commented that once The COR is <br />built out, wayfinding will become not an obstacle, but rather an opportunity for people to <br />describe where they will meet at the park. He pointed out the hardscape, the plaza, landscaping, <br />the pedestrian way, parkland, parking, and more. <br />hs with gas lights, alongside some ice skating. He <br />als <br />out boulevards with trees. He pointed out that once the pond shape, depth and topography <br />identified, staff will know the value of the fill sand, which may be worth tens of thousands of <br />dollars. When the City goes in to dig, it will only have to be done once. Mobilization to move <br />soil around is a big cost. That can be $5,000 to $50,000, so the City only wants to do it once. <br />There will also be a loop trail around the lake. He noted municipal pools are expensive, but <br />wading pools are a different experience. There will also be a pavilion space, restrooms, and <br />concession stand. There will also be cabanas with umbrellas, able to be reserved. <br /> <br />In response to a question by Commissioner Andrusko, Mr. Riverblood emphasized this will be a <br />great place to host parties of all size, possibly even weddings, which would help with the revenue <br />stream. <br /> <br />Mr. Riverblood discussed the water elements, the boardwalk, and the plaza overlooking the <br />pond. <br /> <br />Vice Chair Sis and the Commissioners expressed support and excitement for the ideas and vision <br />presented. <br /> <br />Commission Andrusko noted the plan reminds him of the Macnamara Alumni Center at the <br />University of Minnesota campus. <br /> <br />Vice Chair Sis noted the plan lines up with the desire to be very nature-centric in Ramsey. <br /> <br />Mr. Riverblood recalled the staff report reflects the years of public engagement. People want a <br />lot of feel of natural resources, even in the downtown area. Staff appreciates the opportunity to <br />do some interpretation in the park. <br /> <br />Mr. Riverblood invited further feedback from the public about the plans. <br /> <br />Commissioner Tchuinkwa asked about the previous public input. <br /> <br />Mr. Riverblood listed the various outreach efforts by the City over the past couple of years. He <br />noted that one overwhelming point of feedback is a desire for a splash pad. <br /> <br />Vice Chair Sis asked about the timeframe going forward. <br /> <br />Park and Recreation Commission/March 8, 2018 <br />Page 5 of 6 <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.