My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/08/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 05/08/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:51:09 PM
Creation date
6/20/2018 2:41:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/08/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2037
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observations/Alternatives: <br />Observations: <br />The proposed improvements are consistent with the City's long-term Street Maintenance Program. <br />As discussed with Council on March 27th, bituminous pavement patching work is proposed for several areas of <br />severely damaged pavement in three project areas prior to overlaying the streets. This will help the overlay <br />improvements achieve their design life of 15 to 20 years. The proposed bituminous patching work involves <br />removing the existing damaged pavement, shaping and compacting the existing aggregate base, and placing and <br />compacting new bituminous pavement to the same elevation of the existing pavement. The proposed pavement <br />patching work is shown on plan sheets 20, 21, and 22 of the attached plans. Staff estimated costs for the bituminous <br />patching work at $33,000. Per North Valley's low bid, the cost is anticipated to be $34,711.08, which the City will <br />pay for in full. <br />A total of eight (8) bids were received and opened on May 1, 2018. All bids were checked for errors and <br />omissions. The bid of ASTECH Corp. included several mathematical calculation errors. After adjustments, their <br />bid was increased by an amount of $28.30, which had no impact on the award of bids. A bid summary is included <br />below, as well as in the attached resolution. <br />CONTRACTOR TOTAL BID <br />North Valley, Inc. $544,224.86 <br />Midwest Asphalt Services, LLC $557,871.23 <br />GMH Asphalt Corp. $561,479.63 <br />Omann Contracting Companies, Inc. $573,712.28 <br />ASTECH Corp. $591,518.47 <br />Northwest Asphalt, Inc. $596,864.06 <br />Park Construction Company $599,791.60 <br />C.S. McCrossan $715,994.70 <br />Engineer 's Estimate $581,492.00 <br />Bids were favorable. The lowest responsible bid was received from North Valley, Inc. in the amount of <br />$544,224.86, which is 6.4% less than the Engineer's estimate for construction costs of $581,492.00. <br />Alternatives: <br />Alternative # 1 — Motion to adopt Resolution # 18-081 accepting bids and awarding a construction contract for 2018 <br />Street Overlay Improvements, Improvement Project #18-03. <br />Alternative #2 — Motion to deny adoption of Resolution # 18-081 at this time. <br />Funding Source: <br />The lowest responsible bid was received from North Valley, Inc. in the amount of $544,224.86. <br />The City's 5-year Street Reconstruction and Overlay Program includes the streets listed above as proposed 2018 <br />overlay improvements, allowing the City to utilize street reconstruction/overlay bonds to fund 100% of the <br />improvements. The City's current 10-year Capital Improvement Plan (CIP) includes the proposed 2018 overlay <br />improvements. Copies of each are attached for reference. Bonds will be issued in an amount sufficient to cover all <br />project costs initially, after which a portion of the proceeds will be recovered through special assessments. <br />Special assessments may fund up to 25% of eligible improvement costs per Minnesota Statute Chapter 429, <br />Chapter 8 of the City Charter, and the City's Special Assessment Policy. Eligible project costs cover all costs <br />except bituminous patching costs. Proposed special assessment amounts vary by project area. To be consistent with <br />past practice, special assessments are proposed to be equal across all properties within each project area since each <br />property generally receives the same benefit based on similar property values. This is consistent with the "per lot" <br />method of assessment defined within the City's Special Assessments Policy. Final assessment amounts may be <br />more or less based on final construction costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.