Laserfiche WebLink
CASE <br /> <br />REQUEST FOR SITEPLAN REVIEW; <br />CASE OF VILLAGE BANK <br /> By: Megan Wald, Associate Planner <br /> <br />Background: <br /> <br />Village Bank submitted a site plan for the development of a permanent banking facility <br />on the property located at 7125 Riverdale Drive. The City granted an interim use permit <br />to Village Bank on September 21, 2004, allovcing the applicant to install., a .temporary <br />modular office building on the subject property to operate a bank until a permanent <br />banking facility is constructed. <br /> <br />The following items are enclosed for your information: <br /> <br />a) <br />b) <br />c) <br /> <br />Site location map .- <br />Site plan <br />City Staff review letter dated January 28, 2005 <br /> <br />Notification: <br /> <br />Site Plans do not require a public hearing. <br /> <br />Observations: <br /> <br />The site plan is proposing to construct a 6,000 square foot banking facility. The subject <br />property is 2 acres in size and is zoned B-2 Highway Business; banking facilities are a <br />permitted use in this district. <br /> <br />The site plan is exceeding all required setbacks. Lot coverage has been calculated at 7%, <br />which is under the 45% maximum lot coverage restriction established in City Code. The <br />site plan is proposing sufficient parking stalls. <br /> <br />The site will derive access from Riverdale Drive. <br /> <br />The proposed concrete block and brick accent exterior materials are permitted and desired <br />in the 13-2 District. <br /> <br />The grading and drainage plan is generally acceptable with the revisions outlined in the <br />City Staff Review Letter. The development is subject to review and permitting by the <br />Lower Rum River Watershed Management Organization. <br /> <br />Thc landscaping plan is generally acceptable in accordance with comments outlined in the <br />C[ty Staff Review Letter. <br /> <br />It st~ould be noted that the inteh.m use permit expires on December 31, 2005. The <br />appli6ant anticipates taking occupancy of the permanent facility in September of this year. <br />ihci'cr',:,~-c, .stai'¥ ia recommending that thc moduiar atructure be ..... t~,.,, fi'~m" <br />property 30 days after receipt of Certificate of Occupancy for the new permanent fhcility. <br /> <br />25 <br /> <br /> <br />