My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/12/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 06/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:53:07 PM
Creation date
7/27/2018 8:51:02 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/12/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our Mission: To wok together to respcsibty grow Our community, and to provide quality, cest,effective, and efficient government services. <br />CC Regular Session 7. 1. <br />Meeting Date: 06/12/2018 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #18-112 Accepting Bids and Awarding Contract for Bunker Lake Boulevard and Puma Street <br />Pavement Improvements, Improvement Project #18-05 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #18-112 accepting bids and awarding Contract for Bunker Lake <br />Boulevard and Puma Street Pavement Improvements, Improvement Project #18-05. <br />Background: <br />The proposed improvements comprise the third project in a series of recent improvement projects required to serve <br />current and future developments within the immediate area with utilities and transportation facilities. <br />In the fall of 2017, utility extension improvements were constructed along approximately 1,400-feet of Bunker <br />Lake Boulevard, east of Puma Street. These utility extensions were required to serve the Riverstone residential <br />development west of Puma Street, as well as a portion of the Bunker Lake Industrial Park development south of <br />Bunker Lake Boulevard and east of Puma Street. This work is identified as Phase IA in the attached March 2017 <br />updated Future Business Park Report completed by Bolton & Menk, which includes estimated costs for all <br />improvements needed to support the Future Business Park. <br />Construction of utility extension improvements under Puma Street, north of Bunker Lake Boulevard, were <br />completed from fall 2017 through spring 2018. These improvements will support a majority of the Riverstone <br />residential development, as well as future commercial and residential development east of Puma Street, plus a <br />small area of undeveloped land in the Northfork development, west of the Riverstone development. The area to be <br />served by these utilities, with the exception of the small Northfork area, is within the City's MUSA thereby <br />requiring service by City sewer and water. This work is identified as Phase 1B in the attached March 2017 updated <br />Future Business Park Report. <br />The City Council is now being asked to accept bids and award a contract for construction of the proposed roadway <br />improvements to Bunker Lake Boulevard and Puma Street where the utility improvements were recently <br />completed. Proposed improvements primarily include storm sewer, concrete curb and gutter, and bituminous <br />pavement for both streets, as well as bituminous trail improvements. <br />Attached is a proposal from Bolton & Menk dated December 7, 2017, which details the scope of the improvements <br />and their estimated costs. Further information on these costs are included in the Bolton & Menk memo dated July <br />27, 2017. <br />On May 8, 2018, the City Council approved plans and specifications and authorized advertising for bids. Attached <br />
The URL can be used to link to this page
Your browser does not support the video tag.