Laserfiche WebLink
Mn/DOT Traffic Signal Timing and Coordination Manual <br />Test for FYA Operation by Time of Day <br />Part 2 (Exhibit 3-14) should be performed for each time of day interval. Typically, the evaluation would be <br />for 4 or more intervals throughout the day (AM Peak, Mid -day Peak, PM Peak and Off Peak). Other <br />Intervals can be evaluated as warranted. <br />For the Cross -Product (Question 6) use the highest hourly cross product during the interval evaluated. <br />Exhibit 3-14 Part 2: Permissive FYA Operation by Time of Day <br />Part 2: Time of Day Operation of FYA <br />Start Time <br />End Time <br />Question 3: Number of Left Turn Lanes <br />4 e . • I • : . <br />• • r Does the leftturn have two (2 or, irtorelanesi. <br />' •:, <br />• <br />••••••, • - • • • <br />e. • • <br />. • L.• <br />Question 4: Number of Opposing Through Lanes <br />• • • • • • ' ridesOeleftturnfa;ce three (3) or more opposingthrough <br />- • <br />• <br />> If the answersYes, <br />• ; <br />• Wigh volume ttmes ofth day <br />• :.(Use Engineerii-44a0#qif Decision <br />- to run-FYA bY•30)11.:,. <br />answer' is N4; 09:c*0ittee • <br />fiext <br />•• •. • <br />Question 5: Crash History <br />• ; Ig prOfectO/p'erkiiissive oilie'ratiOn1,316ce anifi.tfieCe e high <br />nlmber bf leftfan related doisiatisduri6s this tirrie:inter?.eal <br />• over a 3-yor---perloci. susceptiblecorrection by protected <br />• • <br />Q Nd: <br />, • only ' • . <br />Question 6: Speed and Cross Product <br />0- • ya,s the Speec.1 45 MPH or greater and the ijeak:1-ioprieft turn <br />• vPlunrje. g'reker ;than 240 yph.or is the peak hOu'r Moss • <br />• product greater than 80,00 (100,066 if 2 opposing fan) <br />, • - <br />Operatio is suggested • . • <br />116 <br />• "ted • <br />, • ; <br />;4 <br />• . <br />(useEngineeriyigJudgmnt <br />ti• <br />'w6. <br />to f;u=•• :•• ice? t9next questlbn <br />...Nrqtiajiisyqii600 faro TOD <br />to the <br />rie>if4C1641.0.); • <br />If the answer to all of the questions in Part 2 are "yes", protected only operation is suggested. Use <br />engineering judgment if a decision to run FYA for the evaluated time period. <br />May 2011 Local Intersection Concepts <br />Page 13-29 <br />