My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 06/26/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:53:28 PM
Creation date
7/27/2018 8:53:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
379
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. Payment of Development Fee's. The PERMITTEE must pay to the CITY the fees <br />described on Exhibit B which may include, but are not limited to, Park Land Dedication <br />Fees, Trail Development Fees, Sanitary Sewer Connection (Trunk) Fees, Water <br />Connection (Trunk) Fees, Sanitary Sewer Lateral Fees, Water Lateral Fees, Storm <br />Management Fees, Street Light as well as Street Light Operation and Maintenance Fees. <br />17. Requirements for Building and Occupancy Peiniits. <br />a. No building permit for any lot in the Plat shall be issued until the PERMITTEE <br />has: (a) installed a Class 5 driving surface to within 300 feet of the structure; (b) <br />provided the CITY Building Official with a Certificate of Survey; c.) the financial <br />guaranty described in Section 12 to the CITY; d.) obtained all necessary permits <br />from the Lower Rum River Watershed Management Organization and has <br />provided a copy of such permit to the CITY; and <br />b. No occupancy permit for any lot in the Plat shall be issued until the PERMITTEE <br />has: (a) constructed vehicular access to the lot, including the installation of at least <br />one layer of bituminous surfacing; (b) constructed all utilities and storm water <br />facilities this Contract requires to serve the lot and such utilities and storm water <br />facilities are in place, and operational and the CITY has accepted those utilities <br />and storm water facilities; (c) for lots that have a slope of less than 2%, provided <br />the CITY with a certificate of grading, prepared by a licensed (State of Minnesota) <br />professional land surveyor, certifying that the flattest grade on the lot is 1% or <br />greater; and (d) installed and planted the sod and landscaping that are required as <br />a part of the Stage I Improvements. <br />18. PERMITTEE Defaults. If the PERMITTEE defaults in the performance of one or more <br />of the PERMITTEE'S obligations under this Contract, i) the CITY gives the <br />PERMITTEE thirty (30) days written notice of the default and ii) the PERMITTEE fails <br />to cure the default within said thirty (30), then the CITY may pursue any and all remedies <br />available at law or in equity including, but not limited to, the following: <br />a. The CITY may, at its option, perform or engage one or more third parties to <br />perform the PERMITTEE'S obligations. If, in the reasonable judgment of the <br />CITY'S staff, the PERMITTEE'S default creates an immediate risk to public <br />health or safety, the CITY may perform or engage one or more third parties to <br />perform the work before the CITY provides the notice described in the initial <br />paragraph of this Section, but the CITY must use commercially reasonable efforts <br />to notify the PERMITTEE as promptly as possible that the CITY is undertaking <br />to perform the PERMITTEE'S obligation or obligations. If the CITY performs <br />one or more obligations of the PERMITTEE, the PERMITTEE must reimburse <br />the CITY for any costs or expenses the CITY incurs, including costs and expenses <br />for CITY staff time, to perform the work within 30 days after the CITY notifies <br />the PERMITTEE, in writing, of the costs and expenses the CITY incurred to <br />perform the work. If the PERMITTEE does not reimburse the CITY within said <br />30 day period, the CITY may pursue any remedies available to the CITY either at <br />law or in equity or, in the alternative, the CITY may draw on the financial guaranty <br />the PERMITTEE has provided to the CITY pursuant to this Agreement to <br />reimburse itself for the expenses the CITY incurs to perform the work. This <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.