My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 06/26/2018
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2018
>
Agenda - Council Work Session - 06/26/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:53:19 PM
Creation date
7/27/2018 8:54:46 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
06/26/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Street Widths and Design [section modified from Sketch Plan Review] <br />The proposed street widths are shown at twenty-nine (29) feet. Traditional City Streets in <br />Ramsey are measured at thirty-two (32) foot widths. These street widths were already approved <br />with the previous Preliminary Plat. <br />A Street Light Plan must be created and submitted to the City for review. The City will work <br />with Connexus Energy to determine the final, appropriate Street Light Plan. <br />Please note that there appears to be objection to the current proposal to vacate road easement for <br />former Puma Street south of Bunker Lake Boulevard. This is an item that will need to be <br />resolved before Final Plat approval, otherwise the Preliminary Plat will need to be modified. The <br />City requests a Letter from Connexus Energy outlining acceptable alternatives to the <br />transmission line in question. <br />Development Fees <br />Standard Development Fees are due on the plat. The Developer has entered into a Master Park <br />Dedication and Trail Development Fee Agreement guiding satisfaction of these fees. <br />Standard Development Fees are due on the plat at time of recording of the Final Plat. The fees <br />will be collected at the rate in effect at time of recording of the plat for buildable lots. <br />• Water Trunk/Connection <br />• Sanitary Sewer Trunk/Connection <br />• Stormwater Management <br />Environmental Review <br />An Environmental Assessment Worksheet (EAW) is mandatory by the State of Minnesota for <br />this project as was previously accepted as adequate with the original Preliminary Plat approval. <br />It is our mission to work together to responsibly -grow our community, and to provide quality, cost-effective and cadent government <br />servicra <br />RiverstoneAddition Planning Division ReviewApri128, 2017(PrdiminaryPlat) <br />Page 5cf6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.