Laserfiche WebLink
DIVISION <br />GENERAL REQUIREMENTS <br />EARTHWORK <br />Probable Construction Costs <br />Municipal Plaza - North <br />TOTAL <br />ESTIMATED UNIT TOTAL <br />DESCRIPTION QUANTITY UNITS COST COST <br />$ 27,900 <br />MOBILIZATION (3%) 1 LUMP $ 27,900.00 $ 27,900 <br />$ 108,467 <br />COMMON EXCAVATION 2 281 CU YD $ 20.00 $ 45,626 <br />SLOPE PROTECTION 507 SQ YD $ 8.50 $ 4,309 <br />SELECT GRANULAR BORROW AND ROUGH GRADING 2 281 CU YD $ 25.00 $ 57,032 <br />TOPSOIL BORROW AND ARCHITECTURAL GRADING 50 CU YD $ 30.00 $ 1,500 <br />CONCRETE WALKS AND STREET $ 444,559 <br />CURB AND GUTTER 830 LF $ 18.00 $ 14,940 <br />DETECTABLE CURB RAMPS 4 EA $ 1,500.00 $ 6,000 <br />4" CONCRETE WALK 14 925 SF $ 6.00 $ 89,550 <br />BITUMINOUS TRAILS LF $ 4.00 $ - <br />PERVIOUS PAVERS (INCL BASE) 2050 SF $ 30.00 $ 61,500 <br />BITUMINOUS WEAR COURSE (2") 285 TON $ 100.00 $ 28,507 <br />BITUMINOUS NON -WEAR COURSE (2'') 285 TON $ 90.00 $ 25,657 <br />AGGREGATE BASE 728 CY $ 22.00 $ 16,005 <br />FOUNTAINS <br />ARCHITECTURE <br />STAIRS AND WALLS $ <br />FENCE/SCREEN $ 40,000 <br />DECORATIVE FENCE 400 LF $ 100.00 $ 40,000 <br />FURNISHING $ 61,200 <br />KIOSK (ARTFUL STRUCTURE, PARK SIGN AND INTERPRETIVE SIGN ) 1 EA $ 15,000.00 $ 15,000 <br />RECEPTACLES 4 EA $ 1,500.00 $ 6,000 <br />BENCHES 4 EA $ 2,500.00 $ 10,000 <br />BIKE RACKS 2 EA $ 1,500.00 $ 3,000 <br />FIRE TABLE 2 EA $ 3,000.00 $ 6,000 <br />DRINKING FOUNTAIN 1 EA $ 5,000.00 $ 5,000 <br />PICNIC TABLES 5 EA $ 3,000.00 $ 15,000 <br />PLAY EQUIPMENT' EA $ 50,000.00 $ TREE GRATE 1 EA $ 1,200.00 $ 1,200 <br />LIGHTING $ 55,800 <br />PEDESTRIAN POLE LIGHTS 31 EA $ 1,800.00 $ 55,800 <br />STORMWATER RE -USE AND TREATEMENT $ 195,500 <br />COLLECTION, CLEAN AND REUSE 0.9 ACRE $ 230,000.00 $ 195,500 <br />GENERAL PLANTING $ 112,400 <br />TREES 35 EA 500.00 17,500.00 <br />SM TREES 31 EA 400.00 12,400.00 <br />PLANTING SOIL 730 CY 30.00 21,900.00 <br />PERENNIALS/SHRUBS 2700 SF 8.00 21,600.00 <br />NATIVE SEEDING W/ PLUGS 0.3 ACRE 5000.00 1,500.00 <br />SOD 650 SY 8.00 5,200.00 <br />IRRIGATION 19700 SF 1.00 19,700.00 <br />ALUMINUM EDGING 1200 LF 8.00 9,600.00 <br />MULCH W FABRIC 300 SY 10.00 3,000.00 <br />UTILITIES $ 50,000 <br />STORM, WATER, POWER 1 LUMP $50,000.00 $ 50,000 <br />ESTIMATED CONSTRUCTION COSTS $ 1,095,826 <br />10% DESIGN CONTINGENCY 10% $ 109,600 <br />ESTIMATED CONSTRUCTION COSTS $ 1,205,426 <br />