Laserfiche WebLink
DIVISION <br />GENERAL REQUIREMENTS <br />EARTHWORK <br />Probable Construction Costs <br />Municipal Plaza - South <br />TOTAL <br />ESTIMATED UNIT TOTAL <br />DESCRIPTION QUANTITY UNITS COST COST <br />$ 48,000 <br />MOBILIZATION (3%) 1 LUMP $ 48,000.00 $ 48,000 <br />$ 53,714 <br />COMMON EXCAVATION 959 CU YD $ 20.00 $ 19,187 <br />SLOPE PROTECTION 213 SQYD $ 8.50 $ 1,812 <br />SELECT GRANULAR BORROW AND ROUGH GRADING 959 CU YD $ 25.00 $ 23,983 <br />TOPSOIL BORROW AND ARCHITECTURAL GRADING 291 CU YD $ 30.00 $ 8,732 <br />CONCRETE WALKS AND STREET <br />FOUNTAINS <br />ARCHITECTURE <br />STAIRS AND WALLS <br />FENCE/SCREEN <br />CURB AND GUTTER <br />DETECTABLE CURB RAMPS <br />4" CONCRETE WALK <br />BITUMINOUS TRAILS <br />PERVIOUS PAVERS (INCL BASE) <br />BITUMINOUS WEAR COURSE (2") <br />BITUMINOUS NON -WEAR COURSE (2") <br />AGGREGATE BASE <br />RIBBON <br />STEPS (INCLUDES CONCRETE STEPS, MECHANICAL, FINISHES) <br />$ 223,853 <br />LF $ 18.00 $ <br />EA $ 1,500.00 $ <br />23 200 SF $ 6.00 $ 139,200 <br />LF $ 4.00 $ <br />2470 SF $ 30.00 $ 74,100 <br />TON $ 100.00 $ <br />TON $ 90.00 $ <br />480 CY $ 22.00 $ 10,553 <br />$ 310,000 <br />1 LUMP $ 60,000.00 $ 60,000 <br />1 LUMP $ 250,000.00 $ 250,000 <br />SF $ <br />$ 225,630 <br />6" RISERS 232 SF $ 90.00 $ 20,880 <br />12" H SEAT WALLS (+18" bused) 1353 LF $ 150.00 $ 202,950 <br />RAILINGS 24 LF $ 75.00 $ 1,800 <br />$ 30,000 <br />DECORATIVE FENCE 300 LF $ 100.00 $ 30,000 <br />FURNISHING $ 71,100 <br />KIOSK (ARTFUL STRUCTURE, PARK SIGN AND INTERPRETIVE SIGN ) 1 EA $ 15,000.00 $ 15,000 <br />RECEPTACLES 6 EA $ 1,500.00 $ 9,000 <br />BENCHES 6 EA $ 2,500.00 $ 15,000 <br />BIKE RACKS 1 EA $ 1,500.00 $ 1,500 <br />FIRE TABLE 4 EA $ 3,000.00 $ 12,000 <br />DRINKING FOUNTAIN EA $ 5,000.00 $ <br />PICNIC TABLES 1 EA $ 3,000.00 $ 3,000 <br />TREE GRATE 13 EA $ 1,200.00 $ 15,600 <br />PLAY EQUIPMENT' EA $ 50,000.00 $ <br />LIGHTING $ 68,400 <br />PEDESTRIAN POLE LIGHTS 38 EA $ 1,800.00 $ 68,400 <br />STORMWATER RE -USE AND TREATEMENT $ 299,000 <br />COLLECTION, CLEAN AND REUSE 1.3 ACRE $ 230,000.00 $ 299,000 <br />GENERAL PLANTING $ 265,128 <br />TREES 33 EA 500.00 16,500.00 <br />SM TREES 27 EA 400.00 10,800.00 <br />PLANTING SOIL 1200 CY 30.00 36,000.00 <br />PERENNIALS/SHRUBS 15485 SF 8.00 123,880.00 <br />NATIVE SEEDING W/ PLUGS 0 ACRE 5000.00 - <br />SOD 2266 SY 8.00 18,128.00 <br />IRRIGATION 32700 SF 1.00 32,700.00 <br />ALUMINUM EDGING 1240 LF 8.00 9,920.00 <br />MULCH W FABRIC 1720 SY 10.00 17,200.00 <br />UTILITIES <br />STORM, WATER, POWER <br />LUMP $50,000.00 $ <br />ESTIMATED CONSTRUCTION COSTS $ <br />10% DESIGN CONTINGENCY 10% $ <br />ESTIMATED CONSTRUCTION COSTS $ <br />50,000 <br />1,644,824 <br />164,500 <br />1,809,324 <br />