Laserfiche WebLink
Probable Construction Costs <br />Waterfront Park - Main Area <br />DIVISION 1 DESCRIPTION <br />TOTAL <br />ESTIMATED UNIT TOTAL <br />QUANTITY UNITS COST COST <br />GENERAL CONDITIONS 1O% $ 487,500 <br />TESTING 1% $ 48,74997 <br />8% CONSTRUCTION CONTINGENCY 8% $ 390,000 <br />TOTAL ESTIMATED CONSTRUCTION COSTS S 5.801.200 <br />PERMITS/BONDS/INSURANCE 3% $ 174,000 <br />DESIGN FEES 12% $ 696,100 <br />I TOTAL PROJECT COSTS $ 6,671,300 I <br />