Laserfiche WebLink
13. Basis of Payment and Project Acceptance <br />Payment shall be made for the work performed, upon the lineal measurement of the <br />centerline of the actual boardwalk constructed. The cost of any additional labor <br />materials, tools and supplies which have not been specifically identified but required to <br />complete the project as per the plans and specifications shall be considered incidental to <br />the project as bid. <br />The project will be accepted and approved at the completion of all aspects of the <br />construction, with the Owner and Contractor walking the boardwalk and finding that <br />there is NO perceptible movement latterly or vertically, nor sounds of movement. <br />