My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 08/09/2018
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2018
>
Agenda - Parks and Recreation Commission - 08/09/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:45:20 PM
Creation date
8/6/2018 1:46:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
08/09/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL SPECIFICATIONS <br />Pave 140' by 9' wide parking bay with connection to boardwalk pursuant to <br />Typical Section and Plan View and description as follows: <br />I/ We agree to furnish all materials, labor and traffic control to perform the work below. <br />• Mobilization and place approximately 160'feet of Type MC Silt Fence <br />• Saw approximately 140' of bituminous pavement —full depth <br />• Remove bituminous— estimate of 7 square yards <br />• Excavate approximately 27 cubic yards of grass roots and organic soils <br />• Prepare subgrade for aggregate base <br />• Place 152 square yards of Geotextile Fabric Type VI <br />• Place and compact *Aggregate Base Class 5 Modified (CV) <br />• Pave 14 ton Type 9.5 Wear Course (SPWEB340B) @ 2" for parking bay <br />• Pave 1.5 ton Type 9.5 Wear Course (SPWEB340B) @ 2.5" for trail connector <br />• Insta11 16 square feet steel truncated domes <br />• Traffic Control per most current addition of Minnesota Temporary Traffic <br />Control Zone Layout Manual <br />*Co1ltractor may substitute and utilize recycled ConBit at Ramsey's Public Works Campus 14100 <br />Jasper Street NW at no cost if desired. <br />Utilization of excavated material: Some of the 'grass roots' and organic soils excavated, <br />may be placed over the specified 2' wide shoulder. <br />Work and Staging Areas: Confine work activities within the 'shoulder' area at all times. <br />No equipment shall be left on City streets outside normal working hours. <br />Specification Reference: The Contractor shall conduct his/her work in conformance <br />with the specifications set forth herein, and in accordance with the Minnesota <br />Department of Transportation Standard Specifications for Construction, 2018 Edition, <br />which is incorporated by reference to these specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.