My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/28/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 08/28/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:55:13 PM
Creation date
8/29/2018 8:21:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/28/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
816
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Answer: No, installing APS is not within scope of the project. Any new pedestrian <br />pushbuttons installed in the course of the work must meet applicable requirements. Note <br />that this project is an alteration to the street and sidewalk and thus must provide <br />compliant curb ramps. <br />GENERAL <br />Question: The local public transit agency has designated a bus stop by placing a sign in <br />the ground along a roadway with no sidewalk. Must a concrete or other improved surface <br />be installed? <br />Answer: No, the placement of a bus stop sign alone does not require other site <br />improvements. When other site improvements are provided they should meet the <br />applicable access requirements. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.