My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/28/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 08/28/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:55:13 PM
Creation date
8/29/2018 8:21:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/28/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
816
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notifications are not required for this case. <br />Observations/Alternatives: <br />Observations: <br />Preparing a Feasibility Report for the proposed improvements will allow staff to refine estimated project costs and <br />develop a proposed funding program, and allows for the use of special assessments against benefiting properties as <br />a partial funding source. <br />The Feasibility Report will explore numerous aspects of the proposed improvements including whether they are <br />feasible and necessary, whether they are cost-effective, and whether they should be completed alone or in <br />conjunction with other improvements. Estimated costs will be explored in greater detail than was used to estimate <br />costs for the CIP. A more detailed project funding program will also be explored, including a description of the <br />methodology used to calculate individual special assessments for benefiting parcels. A preliminary project schedule <br />will also be developed. <br />While preparing the Feasibility Report, Staff will conduct a public input meeting with the residents of Ford Brook <br />Estates to explain the need for the proposed improvements, the scope of the improvements, estimated costs, <br />proposed funding program, and proposed schedule. <br />Staff anticipates requesting Council acceptance of the Feasibility Report later this fall to allow the project to <br />proceed in a timely manner with construction beginning in the spring of 2019. This will also provide for compliance <br />with all applicable provisions of the City Charter, the City's Special Assessments Policy, and Minnesota Statute <br />Chapter 429. <br />If these streets are not reconstructed in 2019, they would need to be added to the next 5-year SROP to allow <br />reconstruction between 2020 and 2024 instead. However, this would reduce the amount of pavement maintenance <br />work that can be completed in 2019 since no new streets can be added to the current 5-year SROP, which is <br />attached for reference. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #18-175 ordering a Feasibility Report for Improvement Project <br />#19-01, Ford Brook Estates Street Reconstructions. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Upon Council authorization, the Feasibility Report will be completed in-house as part of Staffs normal duties. <br />While preparing the report, Staff will explore available options for minimizing project costs, such as by using a <br />full -depth reclamation process instead of removing and replacing the existing pavement. Staff will also utilize data <br />gathered using Ground Penetrating Radar and soil borings per previous Council approvals. <br />Preliminary project costs are currently estimated to be $240,000. Staff proposes to fund the proposed improvements <br />using a combination of special assessments to benefiting properties, street reconstruction bond funds, and <br />stormwater utility funds, as needed. <br />Based on 2013 cost estimates, the City must fund approximately $11,000,000 for Street Maintenance Program costs <br />over the 5-year period from 2015 to 2019 to maintain an acceptable level of service. This equates to an average <br />annual expenditure of $2,200,000 to fund all sealcoat, overlay, and street reconstruction projects. The City currently <br />budgets $500,000 annually for sealcoat projects, leaving $1,700,000 to fund all overlay and street reconstruction <br />projects in a given year. Per the adopted Special Assessments Policy, special assessments may fund up to 25% of <br />overlay and street reconstruction projects. Staff proposes to use street reconstruction and overlay bonds to pay for <br />project costs initially, with up to 25% of the bonds being paid back over time with special assessment proceeds. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.