Laserfiche WebLink
EL I INARY PI I <br />ESTIMATED COSTS <br />Harvest Est. 2nd <br />PROJECT NO.: KRZ14029 003 <br />LOCATION: Ramsey. MN <br />CONTRACT MANAGER: RCH <br />FILE: Cost Estimate - Single Famny xis <br />SCHEDULE G - SOFT COSTS <br />1 Engineering and Surveying <br />2 Construction Services (Inspection), 5% Construction Cost <br />3 Construction Services (Testing) <br />4 Wetland Consultant Services <br />CITY FEES <br />5 Park Dedication Fee <br />6 Trail Dedication Fee <br />7 Final Plat Fee <br />8 Final Plat Escrow <br />9 Water Residential Connection Charge <br />10 Sewer Residential Connection Charge <br />• • <br />• a <br />LANDFORM <br />c. rrm S ': is rir.: h <br />1 L.S. <br />1 L.S. <br />1 L.S. <br />0 L.S. <br />12 Each <br />12 Each <br />1 L.S. <br />1 L.S. <br />12 Each <br />12 Each <br />Date: <br />$50,000.00 <br />$12,700.00 <br />$5,000.00 <br />$0.00 <br />$2,700.00 <br />$725.00 <br />$350.00 <br />$1,500.00 <br />$1,700.00 <br />$1,126.00 <br />5-Apr-18 <br />$50,000.00 <br />$12,700.00 <br />$5,000.00 <br />$0.00 <br />$32,400.00 <br />$8,700.00 <br />$350.00 <br />$1,500.00 <br />$20,400.00 <br />$13,512,00 <br />TOTAL SOFT COSTS $144,562.00 <br />TOTAL HARD + SOFT COSTS <br />COPYRIGHT*LANDFORM <br />$709,065.50 I <br />(21 <br />Itin6art>d), 3m GemSaFf sta in FoadOsa aps:vxa ssnxz rtsrbs tS LandpElPmfT..fwd Str.'.ma, LLC, <br />