Laserfiche WebLink
Our Mission: To wok together to respcsibty grow Our community, and to provide quality, cest,effective, and efficient government services. <br />CC Regular Session 7. 10. <br />Meeting Date: 08/28/2018 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #18-177 Ordering Feasibility Report for Improvement Project #19-03, Wood Pond Hills & <br />Chestnut Ridge Street Reconstructions <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider ordering a Feasibility Report for Improvement Project #19-03, Wood Pond <br />Hills & Chestnut Ridge Street Reconstructions. <br />Background: <br />Figure 1 (attached) shows the general location of the Wood Pond Hills & Chestnut Ridge development in the <br />southeast corner of the City. <br />Figure 2 (attached) shows the overall scope of the project. <br />The City of Ramsey's current 10-year Capital Improvement Plan (CIP) covers calendar years 2018 to 2027. The <br />plan identifies all public streets proposed to be reconstructed or to receive overlays in 2019 as part of the City's <br />long-term Street Maintenance Program. Page 223 from the CIP is attached which shows the streets in Wood Pond <br />Hills & Chestnut Ridge were proposed to receive overlays in 2019. <br />In the spring of 2018 Staff re-evaluated the pavement condition of these streets and found the pavement has <br />degraded past the point where an overlay should be applied, and that a total reconstruct is now required. Staff <br />therefore recommends that these streets be reconstructed in 2019 to allow bonds to be used to pay for the <br />improvements per the City's 2015 - 2019 Street Reconstruction and Overlay Program (SROP). <br />The streets proposed for reconstruction in 2019 within the Wood Pond Hills & Chestnut Ridge residential <br />development include about 3,310 linear feet (0.63 miles) of streets including: <br />• Krypton Street — Sunwood Drive to West plat line <br />• Krypton Street — East plat line to West CDS <br />• 146th Avenue — Nowthen Blvd/CSAH 5 to West plat line <br />• 146th Avenue — East plat line to Junkite Street <br />• Helium Street — Sunwood Drive to 146th Avenue <br />Attached is a street summary sheet including year of original construction, historical maintenance operations, <br />PASER rating(s), and existing pavement section data based on the Ground Penetrating Radar analysis completed <br />by Braun Intertec in 2017. In general, these streets are 24 - 26 years old and have reached the end of their useful <br />life requiring complete reconstruction. Staff will discuss the existing pavement condition in greater detail during the <br />