My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/08/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 02/08/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:40:16 PM
Creation date
2/7/2005 7:58:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/08/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINANCING <br /> <br />hi addition to construCtion cost, overhead charges of twenty-two percent (22%) wilt be applied to <br />cover the following services: <br /> <br /> Engineering mhd Insp¢cti0n 10% <br /> City Staff Administration 5 % <br /> Bonding and Legal 2% <br /> · Contingencies 5 % <br /> <br />It is the City's policy to assess property owners fifty percent (50%) of the total project cost of the- <br />improvements for projects associated with the annual street maintenance program. Properties are <br />assdssed equally regardless of front footages or property size,'since comer lots and cul-de-sac <br />lots, which are common within the City, would receive widely disparate assessments. Since <br />projects are generally classified by subdivisions which have similar characteristics and lot sizes, <br />it is felt that there is a fair apportionment of project costs when assessed equally within the <br />individual subdivisions. <br /> <br />Table 5 contains the distributiOn of costs ;between the City and the benefited parties. A listing of <br />benefited properties are listed in the preliminary assessment role contained in Appendix B. The <br />costs contained within this report are estimated costs. The projects will have a final tabulation <br />made on actual project costs consist.ertl with the methodology described in this report. A public <br />hearing will be held identifying the actual Costs to be recovered by special assessment. Each <br />property may, at any time prior to certificatiOn of the assessment to the County Auditor, pay the <br />whole of the assessment on such pr6perty, with interest, except that no interest shall be charged' <br />if the entire assessment is paid Within 30 days from the adoption of the assessment resolution. <br />Special assessments t'eported to' Anoka iCoUnty shall b'e payable over a' three-year period for <br />sealcoating projects, and over a ten-year period for bituminous overlaying projects, with interest <br />at a rate of two percent (2%) above the U.S. Treasury rate at the time of the special assessment <br />hearing. <br /> <br />PROJECTED PROJECT SCHEDULE <br /> <br />A schedule for the milestones associated with this project is presented in Table 6.. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.