Laserfiche WebLink
Sanitary Sewer <br />Item <br />Connect to eXisting sewer <br />8" PVC san sewer <br />48" manhole <br />8" X 4" wye <br />8" X 6" wye <br />4" service lateral <br />6" service lateral <br />Bituminous removal <br />Class 5 restoration <br />Bituminous base restoration <br />Subtotal <br />Total wi 25% contingencies <br /> <br />Watermain - Service Extension <br />Item <br />Connect to existing watermain <br />8" DiP watermain <br />Hydrant w/valve <br />8" valve <br />1" curb stop and box <br />1" corporation stop <br />1" type K copper <br />4" valve w/box <br />4" DIP service lateral <br />Subtotal <br />Total wi 25% contingencies <br /> <br />Watermain - Looping <br />Item <br />Connect to existing watermain <br />8" DIP watermain <br />Hydrant w/valve <br />Bituminous removal <br />Class 5 restoration <br />Bituminous base restoration <br />Subtotal <br />Total wi 25% contingencies <br /> <br />Street Improvements <br />Item <br />Bituminous removal <br />Bituminous wear <br />Concrete curb and gutter <br />Sod <br />Topsoil borrow <br />Driveway restoration <br />Subtotal <br />Total w/25% contingencies <br /> <br />Sanitary Sewer <br />Watermain - Service Extension <br />Watermain - Looping <br />Street Improvements <br />TOTAL <br /> <br /> APPENDIX C <br /> <br />EBONY STREET PROJECT COSTS <br /> <br />Qnty Un!t- <br />I each <br />400 feet <br />1 each <br />4 each <br />2 each <br />134 feet <br />66 feet <br />i600 sq yds <br />336 ton <br />192 ton <br /> <br />Unit Cost <br />$ 500.00 <br />$ 16.00 <br />$ 1,600.00 <br />$ 135.00 <br />$ 125.00 <br />$ 8.00 <br />$ 15.00 <br />$ 1.50 <br />$ .10.00 <br />$ 35.00 <br /> <br />Qnty <br /> 1 <br /> 450 <br /> 1 <br /> 1 <br /> 4 <br /> 4 <br /> i34 <br /> 2 <br /> 66 <br /> <br />Unit Unit Cost <br />each $ 500.00 <br />feet $ 18.00 <br />each $ 2,000.00 <br />each $ 900.00 <br />each $ 110.00 <br />each $ 50.00 <br />feet $ 9.00 <br />each ' $ 500.00 <br />feet $ 15.00 <br /> <br />Qn~ <br /> 1 <br /> 650 <br /> 1 <br />1560 <br /> 33O <br /> 190 <br /> <br />Unit <br />each <br />feet <br />each <br />sq yds <br />ton <br />ton <br /> <br />' Extension <br />$ 5O0 <br />$ 6,400.00 <br />$ 1,600 <br />$ 540 <br />$ 250 <br />$ 1,072' <br />$ 990 <br />$ 2,400 <br />$. 3,360 <br />$ 6;720 <br />$ ,23;832 <br />$ 29,790 <br /> <br />Qnty <br /> 735 <br /> 355 <br />2200 <br />1470 <br /> 165 <br /> 60 <br /> <br />Unit <br />sq yds <br />ton <br />feet <br />sq yds <br />cu yds <br />sq yds <br /> <br /> E~ension <br />$ 50Q <br />$ 8,100 <br />$ 2,000 <br />$ 900 <br />$ 440 <br />$ - 200 <br />$ 1,206 <br />$ 1,000 <br />$ 990 <br />$ 15,336 <br />$ 19,170 <br /> <br />Project Summary <br /> <br />Unit Co~ E~ension <br />$ 500.00 $ 500 <br />$ 18.00 $ ' 11,700 <br />$ 2,000.00 $ 2,000· <br />$ 1.50 $ 2,340 <br />$ 10.00 $ 3,300 <br />$ 35.00 $ 6,650 <br /> $ 26,490 <br /> $ 33,113 <br /> <br />Unit Cost <br />$ 1.50 <br />$ 38.00 <br />$ 8.00 <br />$ 2.50 <br />$ 10.00 <br />$ 20.00 <br /> <br /> Extension <br />$ 1,103 <br />$ 13,490 <br />$ 17,600 <br />$ 3,675 <br />$ 1,650 <br />$ 1,200 <br />$ 38,718 <br />$ 48,397 <br /> <br />$ 29,790 <br />$ 19,170 <br />$ 33,113 <br />$ 48,397 <br />$ 130,469 <br /> <br /> <br />