My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/02/2018
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2018
>
Agenda - Planning Commission - 08/02/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:31:31 AM
Creation date
8/30/2018 3:58:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/02/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
scenario. The LOS D/E boundary of 35 seconds of delay per vehicle is considered <br />the threshold between acceptable and unacceptable all -way stop sign and <br />roundabout controlled intersection operation in Minnesota. The Highway Capacity <br />Manual sets the threshold lower at all -way stop signs and roundabouts then at traffic <br />signal -controlled intersections based on motorists having more patience at a traffic <br />signal and accepting longer delays. <br />140 <br />120 <br />- 100 <br />0 <br />U <br />0 <br />• 80 <br />co <br />a) <br />60 <br />tin <br />co <br />L <br />> 40 <br />20 <br />0 <br />• Existing <br />ngested at LOS D/E Boundary (35 seconds) <br />N Diamond Lake Road/Brockton S Diamond Lake Road/Pineview Dayton River Road/Pineview Lane <br />Lane Lane <br />2025 No -Build ■ 2025 Preferred Land -Use Build 2025 Mitigation <br />Chart 4 — A.M. Peak Hour Delays: All -Way Stop Sign/Roundabout <br />Controlled Intersections <br />140 <br />120 <br />c 100 <br />0 <br />0) <br />-- 80 <br />co <br />60 <br />0) <br />tin <br />co <br />O 40 <br />20 <br />0 <br />■ <br />ested at LOS D/E Boundary (35 seconds) <br />•. • <br />N Diamond Lake Road/Brockton S Diamond Lake Road/Pineview Dayton River Road/Pineview Lane <br />Lane Lane <br />• Existing • 2025 No -Build ■ 2025 Preferred Land -Use Build 2025 Mitigation <br />Chart 5 — P.M. Peak Hour Delays: All -Way Stop Sign/Roundabout <br />Controlled Intersections <br />Traffic Impact Study 13 <br />North Dayton Development <br />12IM CONSULTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.