Laserfiche WebLink
CC Regular Session 4. 8. <br />Meeting Date: 09/11/2018 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title <br />Adopt Resolution #18-186 Ordering Assessment Roll and Calling Assessment Hearing for Improvement Project <br />#17-02, River's Bend Street Reconstructions <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #18-186 ordering preparation of an assessment roll and calling for <br />an Assessment Hearing at 7 p.m. on October 9, 2018 for Improvement Project #17-02, River's Bend Street <br />Reconstructions. <br />Background: <br />City Improvement Project 17-02 involved reconstructing the following street segments within the River's Bend <br />residential neighborhood; <br />• 147th Lane from the west River's Bend plat line to Waco Street, <br />• 148th Avenue from the west River's Bend plat line to Xkimo Street, <br />• Xkimo Street between 147th Lane and 149th Avenue/Sunwood Drive, and <br />• Yakima Street between 148th Avenue and 149th Avenue/Sunwood Drive. <br />These street segments total approximately 2,774 linear feet, or 0.53 miles. A map showing the scope of the <br />improvements is included as Figure 1 in Appendix A of the attached Feasibility Report. <br />Pre -Existing Conditions <br />These street segments in the River's Bend neighborhood were constructed in 1985 with between 2 and 3'/2-inches of <br />bituminous pavement, 4-inches of class 5 aggregate base, surmountable concrete curb and gutter, and concrete <br />storm sewer. The streets were 30-foot wide from face -of -curb to face -of -curb, and were centered within a 60-foot <br />wide right-of-way. The pavement was cracksealed and sealcoated in 1988 and in 1995. Spot patching was applied <br />on an as -needed basis since. <br />In the fall of 2016, the pavement sections of the above -referenced street segments had PASER ratings of 3, <br />meaning they were past the point of overlaying and instead required complete reconstruction. <br />The existing storm sewer system consisted of concrete catch basins and pipes, which drain runoff from the street to <br />adjacent low-lying areas. Based on design calculations completed by City staff, no modifications were required to <br />the existing storm sewer system. <br />Municipal sanitary sewer and water utilities existed under many of the pavement sections. The existing utilities <br />were inspected and were found to be in good enough condition that no improvements were required before <br />reconstructing the pavement. <br />Completed Improvements <br />All streets were reconstructed matching their existing widths and locations. <br />After all damaged concrete curb and gutter sections were removed and replaced, the existing bituminous pavement <br />sections were reconstructed using the Full Depth Reclamation (FDR) process. This involved grinding the existing <br />bituminous pavement with an inch or more of existing aggregate base (pavement reclamation), then placing and <br />