Laserfiche WebLink
Proj CtDOXY <br />Current Project - Project Markups Listing <br />File Name <br />Markup Name <br />Markup Text <br />Markup Date <br />Created by <br />5 Grade.pdf <br />5 Grade.pdf <br />5 Grade.pdf <br />5 Grade.pdf <br />5 Grade.pdf <br />5 Grade.pdf <br />JJ F <br />JJF No Infiltration on -site <br />JJ F <br />05/10/2018 <br />Joe <br />Feriancek <br />05/10/2018 Joe <br />Feriancek <br />05/10/2018 Joe <br />Feriancek <br />JJF County must grant permission to grade into 05/10/2018 Joe <br />Feriancek <br />County ROW. <br />JJ F <br />05/10/2018 Joe <br />Feriancek <br />JJF County must grant permission for all work within 05/10/2018 Joe <br />County ROW. Provide proof to City of this Feriancek <br />approval. <br />5 Grade.pdf JJF 05/10/2018 Joe <br />Feriancek <br />5 Grade.pdf JJF the entire 100 Yr Storm elevation must be 05/10/2018 Joe <br />contained within drainage easement. Feriancek <br />6 Details.pdf JJF 05/10/2018 Joe <br />Feriancek <br />6 Details.pdf JJF A Site Specific Street Typical Section is required. 05/10/2018 Joe <br />Feriancek <br />4 Site.pdf jnelson add two valves 05/10/2018 John <br />one for the west main and one for the south main Nelson <br />4 Site.pdf jnelson add three valves 05/10/2018 John <br />south,north and west main cluster in intersection Nelson <br />1 Cover.pdf Frankfurth 05/09/2018 Tim <br />Frankfurth <br />1 Cover.pdf Frankfurth Is it possible to have these two sections of Olivine 05/09/2018 Tim <br />Terrace connect? Frankfurth <br />Ramsey Town Center Civil Engineer 02/21/2018 Len <br />Property.pdf Linton <br />Ramsey Town Center Civil Engineer Construct Sidewalk/ Path along Ramsey Boulevard 02/21/2018 Len <br />Property.pdf Linton <br />Ramsey Town Center <br />Property.pdf <br />Civil Engineer Construct Public Sidewalk/ Path along Bunker Lake 02/21/2018 Len <br />Blvd. Linton <br />