My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/10/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 07/10/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:53:50 PM
Creation date
9/11/2018 3:54:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/10/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Anoka County Regional Trail <br />.. • <br />From East Ramsey Parkway south to Sunwood Drive, the trail is approximately 950' and currently <br />exists as a combination of a 10 foot wide asphalt trail and concrete sidewalk immediately back of curb. <br />Ultimately, the trail will be separated from the sidewalk, which is anticipated to occur in a year or two <br />when the parcel is developed. The 10-foot wide bituminous trail will be constructed as part of a City of <br />Ramsey park. The trail will then tie into the intersection of Center Street and Sunwood Drive. <br />From that point, the trail then crosses Sunwood Drive (30 mph road) via a crosswalk and follows along <br />the sidewalk of an <br />existing parking ramp for <br />the Northstar Transit <br />Station. It is at this point <br />that bicyclists would be <br />asked to dismount and <br />walk or carry their bikes <br />to the elevator or stairs for <br />the rail station pedestrian <br />bridge or bicyclists could <br />use the adjacent parking <br />ramp to access bridge. <br />Existing Northstar Transit Station Pedestrian Br' <br />The first section of the ExT COP S <br />pedestrian bridge, within <br />SH U 04 roe PFFT.7rn4 R FII RFRIIJ,. _ F <br />the station, is an enclosed <br />walkway from one <br />platform to the other. <br />Once on the south side of <br />the station, a new 550' <br />long by 12' wide open-air <br />pedestrian bridge is <br />proposed to connect to the <br />enclosed walkway and <br />allow users to cross safely <br />over Highway 10 and Proposed Pedestrian Bridge over Highway 10 <br />Riverdale Drive where a <br />helical ramp will connect <br />them to an existing 10' wide paved trail along Riverdale Drive. At Riverdale Drive, the trail is <br />proposed to follow Riverdale Drive southeast into Mississippi West Regional Park. <br />S. SHEET 03 PUP PFFSPFcr. REnugams or <br />BAIL. TRUSS SEalaTCress,G H.1-mr 19 <br />MISSISSIPPI SKYWAY - CITY OF RAMSEY <br />VIM 5H 05 PMPERSPFCINF. <br />HIGHWAY-10 <br />02 FOP i1ENDGI NGs OF HELD, <br />Q&MENK <br />Development Concept • 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.