Laserfiche WebLink
BRIDGE <br />WORHIN6 LINE, I <br />6HC11G5E <br />67 <br />—SEE HELIX SLAB AND RING BEAM <br />DETAILS FOR REINFORCEMENT <br />O MATCH06HC1105E BARS <br />/-6ecaD3 <br />02/ OL. SIEM <br />SHC90 <br />�C2 C <br />B� <br />ELEVATION <br />®BOLTON <br />& MENK <br />6HC404 <br />PENGINEER SIGNATURE <br />3/a" <br />A <br />CLR <br />HC1105E <br />6HC602 <br />—SEE HELIX SLAB AND RING BEAM <br />DETAILS FOR REINFORCEMENT <br />COLUMN 6 <br />MATCH 611C1105E BARS <br />1 <br />5" CUD.] <br />COL. STEM <br />SECTION B - B <br />A <br />—61,404 <br />z7-6HC403 <br />HELIX COLUMN 6 <br />DETAILS & REINFORCEMENT <br />NOTES <br />FOP BILL OF REINFORCEMENT, SEE SHEET 47. <br />S.A.P.199-010 -�12 'IRIDGE NO. <br />02053 <br />SHEET NO. 41 OF 99 SHEETS <br />