My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/10/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 07/10/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:53:50 PM
Creation date
9/11/2018 3:54:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/10/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IL COL. <br />COL 2— <br />COL. 5 & SAS <br />TRAIL <br />WORKING LINE <br />36'-J z.. RADtUS <br />�MSRVNE pF RAILING <br />CENTER DE HELIX <br />W.P."AA" v - ]]I227621 <br />/ r— BEGIN BRIDGE <br />40 <br />5 COL 0- <br />GUMSIDEMRAIL SAS <br />E COL .6— <br />-4 POSTS e 1070" <br />TRAIL AND <br />END RAILING WORKING LINE <br />�526%. 5 PGSIS a 1070" = 4050" <br />'BA.. A 2L POSTS e 3'-2ye" = 3'-lye" <br />PARTIAL LOWER HELIX PLAN <br />®BOLTON <br />& MENK <br />ENGINEER SIGNATURE e <br />INSIDE RAIL SPACING IRIGHI SIDEI <br />.11122s5=—END RAILING <br />'" OUTSIDE RAIL SPACING (LE, SIDE/ <br />RAILIING DETAILS <br />NOTES <br />FOR WORKING POINI DIMENSIONS AND SEE <br />coo LIPPERN HIRECTIONAL ALF OW HELD,INDICSHEET <br />ESE EIREBR COORDINATES <br />'ELD 6'RAILING ON HELD NOMINAL SHALL BE P HEIGH-II, SEE <br />aON SHEET 75. <br />ALL POST SP <br />ACING DIMENSIONS ARE. MEASURED <br />ALONG CENTERLINE OF RAILING. <br />S.A.P.199-010-012 'IRIDGE NO. <br />(SHEET NO. 77 OF 99 SHEETS( 02053 <br />
The URL can be used to link to this page
Your browser does not support the video tag.