Laserfiche WebLink
179 <br />Central Anoka County Regional Trail - Pending Alternative Alignment <br />Anoka County Parks & Recreation has submitted to Metropolitan Council, a Master Plan <br />Amendment for the realignment of the Central Anoka County Regional Trail. This amendment is <br />located between Ramsey Boulevard and Center Street and connects to the Northstar Commuter Rail <br />station and future grade separated pedestrian crossing of Highway 10, for a safe, direct, and multi - <br />modal connection to the Mississippi River Regional Trail, and Mississippi West Regional Park. <br />The realignment in Ramsey is needed as, presently the City of Ramsey has limited access to the <br />Mississippi River and Mississippi West Regional Park because Highway 10 is a significant barrier <br />for bicycle and pedestrian access. The amendment will change the alignment of the Central Anoka <br />County Regional Trail within the City of Ramsey to better connect with local parks, trails, <br />restaurants, businesses and transit, while still providing a safe connection to the river and <br />Mississippi West Regional Park. <br />Bunker Lake Blvd <br />Proposed City of Ramsey Parks <br />Now Proposed Trail Route '56 <br />Legend <br />PROPOSED REALIGNMENT OF CENTRAL n 7 <br />� ANOKA COUNTY REGIONAL TRAL, TRAIL Rai, !n <br />ALREADY DUSTING 4if D. i'ligh at <br />m <br />PROPOSED REALIGNMENTOF CENTRAL <br />r <br />ANOKA COUNTY TEDIOI�ALTRAL 3y 70 <br />m <br />DUSTING CENTFU LANOKA COUNTY REGIONAL ilQ' ED <br />TRAIL <br />BUSTING REGIONAL TRAIL DESIGNATION TO <br />HE REMOVED <br />PLANNED REGIONAL TRAIL DESIGNATION TO <br />DEREMOVU3 <br />CURRENT MISSISSIPPI RPVERTRAIL <br />ALIGNMENT <br />MISSISSIPPI RIVER REGKINALTTUJL, 2118 <br />CONSTRUCTION <br />I I RAILROAD <br />ROADWAY <br />OTRANSIT STATION <br />CITY PARK <br />CITY -FRAIL <br />- REGIONAL PARK, RESERVE <br />city of RAMSEY <br />♦ <br />♦ <br />♦ <br />Mississippi River <br />Mississippi West <br />RegionaE Park <br />• <br />16: <br />Existing regional trail <br />designation proposed <br />to be removed from <br />Master Plan_ <br />August 2018 Draft <br />Comprehensive Plan 2040 <br />