Laserfiche WebLink
7. CONCLUSIONS AND RECOMMENDATIONS <br />City of Ramsey Improvement Project No. 18-00 proposes to reconstruct the bituminous <br />pavement section, to remove the existing bituminous curb and replace it with B618 concrete curb <br />and gutter, and to complete miscellaneous appurtenant work on the following street segments <br />within the Stanhope Terrace residential subdivision: <br />1. Lite Street (approx. 1,320 linear feet) — Alpine Drive to north cul-de-sac. <br />2. 154th Lane (approx. 950 linear feet) — -Lite Street to Roanoke Street. <br />3. 153rd Court (approx. 300 linear feet) — Roanoke Street to west cul-de-sac. <br />It is the recommendation of City staff that City Project No. 18-00 is feasible, necessary, and cost- <br />effective from an engineering standpoint, and this project would best be constructed in <br />conjunction with the River's Bend and The North Forty Street Reconstruction projects as <br />proposed herein. <br />The following Staff recommendations related to the proposed project are presented for Council <br />consideration and concurrence: <br />1. Remove existing bituminous curb and replace with B618 concrete curb and gutter. <br />2. Reconstruct existing bituminous pavement using full -depth reclamation process, meeting <br />the City's standard residential pavement section of 4-inches aggregate base class 5 or <br />(reclaim), 2-inches new bituminous base course, and 11/2-inches new bituminous wear <br />course. <br />3. Staff recommends excluding private irrigation system work from this project. Instead, <br />staff will notify property owners of pending construction as far in advance as possible, <br />and instruct them to relocate their irrigation system(s) away from the construction area <br />during construction, then allow replacement in or near the original location after <br />construction is complete. <br />4. Staff recommends holding a neighborhood information meeting on November 1, 2017 to <br />inform property owners of the proposed improvements and to gather their input prior to <br />competing plans and specifications and requesting Council approval to advertise for bids <br />as outlined in the project schedule. <br />5. Order an assessment appraisal consultation to ensure special assessments do not exceed <br />the benefit received as a result of the improvements. <br />6. Meet with -Lite Street property owners to discuss acquisition of easements for cul-de-sac. <br />The City Council is asked to act on the following items related to the proposed project: <br />1. Accept the preliminary residential special assessment rate of $6,733.36 per lot. <br />2. Authorize an assessment appraisal consultation to ensure all special assessments are <br />commensurate with benefit received from the proposed improvements. <br />3. Adopt Resolution #17-10-271 approving this Feasibility Report and ordering the Public <br />Hearing for November 14, 2017. <br />Feasibility Report <br />Stanhope Terrace Reconstructions <br />City of Ramsey Project No. 18-00 <br />Page 14 <br />