Laserfiche WebLink
conditions continue to be present at the intersections of TH 10 and Ramsey and Armstrong <br />Boulevards. <br />Project traffic would cause the intersections on TH 10 to deteriorate to LOS F and would cause <br />the stop -controlled intersection on Industry Avenue, Ramsey Boulevard, and Armstrong <br />Boulevard to move into LOS E and F conditions during one or both peak periods. <br />New intersections created by the project with Industry Avenue (see Figure 21.2) would operate <br />in acceptable conditions with the exception of the central north -south street (NS3) at Industry <br />Avenue during the PM peak period. The two new intersections of the east -west parkway (EW1) <br />with Ramsey and Armstrong Boulevards would operate in unacceptable conditions during at <br />least one peak period. <br />Within the project site, the extension of Sunwood Drive would be the primary east -west <br />connector street in the project site and is estimated to carry 10,000 to 13,000 vehicles per day <br />(vpd) west of NS6 Street. Volumes on Sunwood west of Ramsey would be about 18,000 vpd as <br />shown in Figure 21.2. West of NS6 Street, the volume on Sunwood Drive would be adequately <br />handled by a two-lane cross section (one lane in each direction). However, left -turn lanes would <br />be needed at cross streets. Between NS6 Street and Ramsey Boulevard, four lanes would be <br />needed to accommodate the projected volumes. Two-way or all -way stop control at the <br />intersections of Sunwood Drive internal to the site would provide LOS C or better conditions for <br />the level of traffic projected at those locations, although the intersections with NS6 and/or <br />N5 5 Streets may require signalization for acceptable PM peak hour operations. <br />The EW1 parkway would carry about 3,600 vpd on the western end of the project and between <br />5,000 and 9,000 vpd on the eastern end. The proposed one -lane parkway cross section would be <br />adequate for the segments of the EW1 parkway. <br />The other east -west streets internal to the project, because of their discontinuous nature would <br />carry less volume than either Sunwood Drive or the EW1 Parkway and would generally be under <br />4,000 vehicles per day (and some would be in the under 1,000 range). Two-lane cross sections <br />and stop (or yield control on the lower volume ones) would be appropriate. <br />The north -south streets internal to the project would carry slightly higher volumes, particularly <br />the three streets that would have full access intersections with Industry Avenue. Those streets <br />would have between 2,100 and 5,700 vehicles per day. The other north -south streets inside the <br />project would be expected to have less than 2,000 vehicles per day, with the exception of the <br />NS6 Street that serves the employment cluster in the southeast corner of the site, which would <br />have upwards of 4,000 vpd. Two-lane cross sections and stop (or yield control on the lower <br />volume ones) would be appropriate although signals may be required at the NS6 and/or <br />NS5Streets intersections with Sunwood Drive. <br />Summary of Environmental Impact, Direct environmental impacts due to the traffic analysis are <br />addressed in Items 22 and 24, which address vehicle related air emissions, and dust, odors, and <br />noise, respectively. <br />21-7 <br />