Laserfiche WebLink
MITIGATION PLAN <br />The AUAR Mitigation Plan is outlined below. If mitigation items have been revised or updated, they are noted as such below. Red text <br />indicates new items that were not included the original AUAR or previous update. <br />ITEM 8. PERMITS AND APPROVALS REQUIRED <br />As projects are proposed, the project proposer will be required to obtain permits and approvals. Projects proposed since the original AUAR <br />have obtained proper approvals. Additional permits that may not be listed here may also be required. <br />Unit of Government <br />Type of Application Status <br />Federal <br />Army Corps of Engineers Section 404 Permit <br />Determined not to <br />be "waters of the <br />United States" <br />State <br />Minnesota Environmental Quality Board Environmental Assessment (AUAR) <br />Minnesota Board of Soil and Water Resources Erosion and Sediment Control Plan Approval <br />Sanitary sewer connection and wastewater <br />routing <br />Minnesota Pollution Control Agency <br />NPDES Phase II construction and MS4 (4) <br />State Historic Preservation Office Historic and archeological site preservation <br />Completed 2003 <br />Updated 2013 <br />Updated 2018 <br />To be Applied for <br />To be Applied for <br />MS4 Permit <br />application <br />submitted 3/10/03; <br />construction <br />permits submitted <br />as needed <br />No significant site <br />found <br />1 Mitigation Plan Update - 2018 September 2018 <br />