Laserfiche WebLink
MitjgAtion element, Prior to any earth -moving activity on the site, an erosion and <br />sediment control plan will be prepared in accord with the requirements of the City of <br />Ramsey and the LRRWMO. Technical assistance in the preparation of this plan will also <br />be sought from the Anoka Conservation District, the Minnesota Pollution Control <br />Agency and the DNR. The City will be permitted through the Phase II NPDES nonpoint <br />program as a Municipal Separate Storm Sewer System (MS4) operator, and will be <br />subject to all of the provisions of that program, including reducing the discharge of <br />pollutants to the —maximum extent practicable" (MEP) through construction site runoff <br />control. Any construction on the site will also be permitted through MPCA's NPDES <br />general construction permit process. <br />Prior to any earth moving in the south east corner of the site, Burlington Northern Santa <br />Fe Railroad should be contacted in regards to arsenic contaminated soils. A more <br />detailed description of contamination and contact information is included in Item 20. <br />Elements of erosion protection will include: phased construction with minimized periods <br />of bare soil exposure, rapid re -vegetation, slope/grade stabilization, use of mulch and <br />fabric on exposed soils, temporary and permanent (if needed) sediment basins, properly <br />installed and maintained silt fencing, and adoption of a regular maintenance and <br />inspection schedule. <br />16-2 <br />