MitigAtion element - Both the wastewater flows and the projected loadings from the RTC <br />development can be effectively transported and treated by the MCES system. In <br />addition, future development and resulting flows are within the range of those estimated <br />in the City's 2001 Comprehensive Plan, as amended in 2002. Therefore, it does not <br />appear that there is any cause for specific remediation actions. A 30-inch sewer main is <br />recommended to serve the RTC. <br />As noted earlier, it will be necessary for the City to update its Comprehensive Sewer <br />Plan, following discussion with MCES on increased allocated capacity. In addition, it <br />will be important to measure and test the wastewater flows from the new development on <br />a periodic basis. This will allow the City and MCES officials to monitor the <br />characteristics of the wastewater generated by the development over time and to address <br />any future unforeseen changes. <br />18-11 <br />