My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/16/2018
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2018
>
Agenda - Public Works Committee - 10/16/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:19:26 AM
Creation date
10/15/2018 10:54:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/16/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. CONCLUSIONS AND RECOMMENDATIONS <br />City of Ramsey Improvement Project No. 18-02 proposes to reconstruct the bituminous <br />pavement section, to remove the existing bituminous curb and replace it with a combination of <br />B618 concrete curb and gutter and bituminous curb, and to complete miscellaneous appurtenant <br />work on the following street segments within the HY-10 Ramsey commercial subdivision: <br />1. 146th Avenue (approx. 230 linear feet) — Ferret Street to bulb of east cul-de-sac. <br />2. 147th Avenue (approx. 190 linear feet) — Ferret Street to 180 feet west of Armstrong <br />Boulevard. <br />3. Ferret Street (approx. 900 linear feet) — 146th Avenue to north cul-de-sac. <br />It is the recommendation of City staff that City Project No. 18-02 is feasible, necessary, and cost- <br />effective from an engineering standpoint, and this project would best be constructed as a stand- <br />alone project as proposed herein. <br />The following Staff recommendations related to the proposed project are presented for Council <br />consideration and concurrence: <br />1. Remove existing bituminous curb. 147th Avenue will receive B618 concrete curb and <br />gutter. 146th Avenue and Ferret Street will receive new bituminous curb. The existing <br />bituminous curb would likely not hold up to the full -depth reclamation process. <br />2. Reconstruct existing bituminous pavement using full -depth reclamation process, <br />meeting the City's standard pavement section. Staff proposes 11/2-inches new <br />bituminous wear course, 2-inches new bituminous base course, and 6-inches <br />aggregate base class 5 or (reclaim). <br />3. Extend watermain and storm sewer west along 147th Avenue for future development. <br />4. Staff recommends excluding private irrigation system work from this project. Instead, <br />staff will notify property owners of pending construction as far in advance as <br />possible, and instruct them to relocate their irrigation system(s) away from the <br />construction area during construction, then allow replacement in or near the original <br />location after construction is complete. <br />5. Staff recommends holding a neighborhood information meeting on September 13, <br />2018 to inform property owners of the proposed improvements and to gather their <br />input prior to completing plans and specifications and requesting Council approval to <br />advertise for bids as outlined in the project schedule. <br />6. Staff recommends assessing special benefitting properties for these improvements per <br />the area method. If assessments are adopted by council action, order an assessment <br />appraisal consultation to ensure special assessments do not exceed the benefit <br />received as a result of the improvements. <br />The City Council is asked to act on the following items related to the proposed project: <br />1. Adopt Resolution #18-XXX accepting this Feasibility Report and ordering a Public <br />Hearing for October 9, 2018. <br />Feasibility Report <br />HY-10 Ramsey Street Reconstructions <br />City of Ramsey Project No. 18-02 <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.