My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/16/2018
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2018
>
Agenda - Public Works Committee - 10/16/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:19:26 AM
Creation date
10/15/2018 10:54:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/16/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Project # 15-STR-012 <br />Project Name 2019 Overlay Projects <br />Description I <br />Each paved street within the City is scheduled to receive preventative maintenance on a regularly scheduled basis, including reconstruction at the end of its useful life. <br />Department Street Improvements <br />Contact <br />Type Improvement <br />Useful Life 20 Years <br />Category Street Improvement <br />Priority 1-Existing Obligation (High) <br />Status Active <br />2019 Projects: Brookview Estates, Meadow View, Flintwood Hills, Wood Pond Hills, Chestnut Ridge <br />There is a total of $2.2M designated to maintain streets annually. <br />Overlays will be assessed at 25% of cost <br />Justification <br />Total Cost $612,200 <br />Regular scheduled maintenance safeguards the considerable investment the City has in its pavements by cost effectively maximizing pavement life and minimizing emergency repairs. <br />Overlaying streets provides additional pavement life. These streets were selected based on Paser rating and time since last pavement maintenance treatment. <br />Look at Possibility of Using MSA or PIR funds for portion of costs instead of bonding. <br />Revisit Program for 2020-2025 <br />Expenditures 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Total <br />Improvements Other than 612,200 612,200 <br />Building Cost <br />Total 612,200 612,200 <br />Funding Sources 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Total <br />Special Assessment - 153,050 153,050 <br />Bonded <br />GO Bonding (Road 459,150 459,150 <br />Funding) <br />Total <br />612,200 612,200 <br />223 <br />
The URL can be used to link to this page
Your browser does not support the video tag.