Laserfiche WebLink
Project Name <br />Storage Ming at Fire Stailor 1 <br />Addlia,al Land Fur Ceotral Park <br />Zeele Roadway Impruven-enk <br />COO Bunker Lake Eflud (Arnstrung loRam say Blvd) <br />Department <br />Municipal Buildings <br />Park iv reuemente <br />Street Impra/evenis <br />Street improvements <br />Priority 5.-Oppnrtunity/UniiindediPteehofdel' <br />Sour, Hwy 10 Frontage Rd-SLB Lo Atroke Street Imara.+ernenfs <br />2023 <br />Priority 3-E'xi.'flttg Obligat on (fled) <br />Core Switch Replacement <br />Engineering Plotter Replacement <br />Replace TeiLer 11(Sp1} <br />2023 Ford Egpleter Replace 2019 Ford Explorer p3X X <br />2021 ChavTahoe Replace 2'019 CI' eiTahoa 113XX <br />2021 Chev lahce Reples) 2019 Char Tahoe 113XX <br />Replace 200d Tree Spade <br />Replace 2006 Tanderit Axle Ptaru Truck Ur it#666 <br />Replace Uni1676.2010 4'iNneel Dr ve lien <br />Replace Pumps at Lift Stern 42 <br />Recanstrueticn Streets: Nature View & Sartehrer9 6 <br />Reconstruct Streeter Fox Ridge Estates 1st.S, 2nd <br />2021 Overay Piujecls <br />Prkr[tpr 4-NVerr•,Adrliriir (. fed) <br />krigtL&I for Tittered Park <br />Tcta]far 2022 <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Caprtr,l Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Capital Equipment <br />Sewe• Utility <br />Street Im3ro'a+r rnanis <br />Street Irrornvemenis <br />Sired Improvements <br />Palk I mprouemenls <br />Project # <br />18.OWWG-002 <br />15wPARK-01 <br />64•STR-012 <br />04.5TR•d14 <br />16•STR-004 <br />17•JT Q79 <br />17-iTOif <br />FM 501 <br />POL•377 <br />POL•378 <br />1OL-379 <br />PWi02 <br />PW-668 <br />PW678 <br />1$-SEW-643 <br />17-STR-007 <br />17,5TR-068 <br />19-STR-008 <br />r; 5-PARK-Ole <br />Priority <br />4 <br />4 <br />4 <br />4 <br />Total frsr^ Prioriry <br />5 <br />Total for: Prbr4ty 4 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Total ,for.: Priority 3 <br />4 <br />(oral for! Priori* ti <br />Priority S-Opp •iumity/Urifiinded/PJaceltokder <br />Construct Well 9 aid Purryhause Water Uttity 16•VITR-052 5 <br />Total for,: Priorirj' 5 <br />To/Ai rat 2.023 <br />Project Cost <br />2G,OOU <br />250,O00 <br />1,091.000 <br />4,1170,O0C1 <br />20,157,500 <br />700,01 <br />700,000 <br />26,461,513E <br />50304 <br />10,000 <br />215,0OO <br />34,000 <br />42,500 <br />42 500 <br />52,000 <br />21.5,000 <br />62,000 <br />34,000 <br />815,650 <br />1,735,260 <br />889,200 <br />4,265,130 <br />76,000 <br />1, j00,O00 <br />1,700,1150 <br />6,041,130 <br />