My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/13/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:57:20 PM
Creation date
11/14/2018 8:53:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/13/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
760
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 4. 12. <br />Meeting Date: 11/13/2018 <br />By: Chloe McGuire Brigl, Community <br />Development <br />Information <br />Title <br />Adopt Resolution 18-228 Granting Site Plan Approval for Parkside Village; Case of Centra Homes, LLC <br />Purpose/Background: <br />The purpose of this case is to review a site plan application made by Centra Homes, LLC for the build -out of <br />Ramsey Town Center 9th Addition via Parkside Village. Ramsey Town Center 9th Addition was platted in 2005 <br />but never fully finished. The original developer built two townhouse buildings and put the first lift of asphalt on the <br />private road, but the road needs to be completed, and the remainder of the townhomes built. <br />As some of the required changes are architectural in nature, Staff will bring back final renderings to City Council <br />before building permits are issued. This will allow City Council final architectural approval. <br />Notification: <br />No notification required for site plan approval. <br />Observations/Alternatives: <br />Since 2005, City standards in the COR have changed in regard to architectural review, and the City has different <br />regulations surrounding topsoil requirements, wetland setbacks, landscaping, and infiltration. Due to these changes, <br />the City requested the applicant come back forward with a site plan in order for Staff and the City to approve the <br />new buildings. The proposal shows private, internal roadways and 13 new, detached townhome buildings. The <br />applicant is proposing to follow the site plan set forth by the previous developer, which includes attached <br />townhomes and private roads. The proposed townhomes generally meet the architectural guidelines of the COR but <br />will require larger porches. The CIty has already approved the final plat for this project, so this discussion is strictly <br />about the landscape plan, architectural standards, and approving the grading plan. Staff is reviewing the new <br />buildings under the current COR regulations, which requires changes to the elevations, exterior finish, porch/deck <br />sizes, and adding articulation along the building. <br />The Planning Commission met on November 1, 2018 and discussed the site plan. The Planning Commission <br />recommended approval unanimously of the site plan with increased architectural standards and modifications to the <br />exterior elevations. Final archiectural renderings will be brought back to City Council once the required changes <br />have been made on the plan set. This preliminary approval will allow Centra Homes to begin preliminary work on <br />the project. <br />Funding Source: <br />The applicant is responsible for all costs associated with Project. <br />Recommendation: <br />The Planning Commission recommends approval of Resolution 18-228 granting site plan approval for Parkside <br />Village, contingent upon compliance modifications to Exterior Elevations and City Engineer Review. <br />Action: <br />
The URL can be used to link to this page
Your browser does not support the video tag.