My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/13/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:57:20 PM
Creation date
11/14/2018 8:53:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/13/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
760
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. PROPOSED IMPROVEMENTS <br />4.1 Street and Stormwater Improvements <br />4.1.1 Street Improvements <br />The streets in Ford Brook Estates are proposed to be reconstructed by matching existing <br />widths and elevations with bituminous pavement and ditch sections to carry storm water <br />runoff to Ford Brook, due to the observed presence of clay at the pavement surface, full - <br />depth reclamation is not proposed. <br />The proposed surface improvements are shown on Figure 1 in Appendix A. <br />Street Design: <br />180th Lane and Krypton Street are currently rural residential streets with ditch sections, 24- <br />feet wide to the edge of pavement. The cul-de-sac on Krypton Street is 85-feet in diameter. <br />Existing and proposed traffic counts are consistent with typical residential streets. <br />180th Lane and Krypton Street mainline street segments are proposed to be reconstructed <br />at their current width. The Krypton Street cul-de-sac is proposed to be reconstructed to a <br />diameter of 100-feet. This will bring the cul-de-sac up to current City standards and allow <br />school buses to use the cul-de-sac. Anoka -Hennepin School District can no longer stop on <br />Highway 47 to pick up or drop off students. A typical section for the proposed pavement <br />reconstruction improvements is shown in Figure 2 in Appendix A. <br />City Staff is proposing a pavement section design of 1.5 inches bituminous wear course, 2 <br />inches bituminous base course, and 4 inches of aggregate base course. This pavement <br />section would be constructed over 2 feet of imported select granular subgrade after it is <br />shaped and compacted. The select granular is placed on top of geotextile fabric which will <br />help keep the select granular from being contaminated by clay subgrade materials. <br />4.1.2 Storm Sewer Improvements <br />The existing ditch sections are in good condition. Re -shaping the ditches will be required <br />due to the subgrade soil corrections, but ditches will be restored to existing grades. The <br />existing driveway culverts are not planned to be replaced. No stormwater treatment <br />improvements are required for this project since the streets are proposed to be reconstructed <br />at their current width. <br />4.1.3 Geotechnical Considerations <br />Braun Intertec, Inc. (Braun) completed a Geotechnical Exploration and Engineering <br />Review including two (2) soil borings, located mid -block 180th Lane and the Krypton Street <br />cul-de-sac. The locations of the borings are shown in the Boring Location Map in the <br />Appendix of Braun's report, attached in Appendix C. Braun recommends completing a 6- <br />Feasibility Report <br />Ford Brook Estates Street Reconstructions <br />City of Ramsey Project No. 19-01 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.