My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/13/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:57:20 PM
Creation date
11/14/2018 8:53:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/13/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
760
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Copies of Braun Intertec's GPR results and NTI's Geotechnical Exploration Report are attached in Appendix C in <br />the attached Feasibility Report. <br />The City evaluates and rates the condition of pavement sections on all City streets on an annual basis using the <br />Pavement Surface Evaluation and Rating (PASER) system. In the summer of 2018, the pavement sections of the <br />above referenced street segments were rated with a PASER rating of 2, with the exception of the south half of <br />Krypton Street receiving a rating of 4. PASER ratings of 4 and below generally indicate the street requires <br />complete reconstruction. <br />Pictures of the existing streets are located in Appendix A in the attached Feasibility Report. <br />Proposed Improvements <br />All damaged concrete curb and gutter sections are proposed to be removed and replaced. <br />The existing bituminous pavement section will be reconstructed using the Full Depth Reclamation (FDR) process, <br />which involves reclaiming the existing bituminous pavement section, along with a portion of the underlying <br />aggregate base. The reclaim material generated by this process is then spread over the reshaped and compacted <br />existing aggregate base between the curb and gutter. Excess reclaim material is then removed and hauled off site to <br />allow 3'/2-inches of new bituminous pavement to be placed over the remaining compacted reclaim material. This <br />results in a 7-ton pavement design, which is the City standard for residential streets. <br />No improvements are proposed to the existing sanitary sewer and watermain infrastructure. However, these systems <br />will be tested, and if repairs are needed they will be completed separately and paid for with utility enterprise funds. <br />Storm sewer catch basins are proposed to be repaired as needed, including resetting of castings. <br />Estimated Costs <br />The engineer's opinion of probable costs for completing the proposed improvements outlined in this report is <br />$372,236.52. Estimated costs include 5-percent contingency costs plus 23-percent indirect costs for administrative, <br />engineering, finance and legal costs. A summary of the engineer's opinion of probably costs is included in <br />Appendix Bin the attached Feasibility Report. <br />Funding Program <br />This project is proposed to be funded using a combination of street reconstruction bond proceeds in the amount of <br />$291,590.84, special assessments to benefiting properties in the amount of $76,918.30, and storm sewer funds in the <br />amount of $3,727.38. <br />A total of 59 benefiting parcels have been identified as eligible for special assessments. Staff recommends applying <br />25-percent of all eligible project costs equally across the 59 assessable properties using the "per lot" assessment <br />method as allowed by the City's adopted Special Assessments Policy. Eligible project costs include all costs except <br />those related to subgrade corrections and public utility improvements. This results in a proposed preliminary <br />assessment rate of $1,303.70 per assessable parcel. <br />Staff recommends ordering a special benefit consultation report for this project to verify the proposed assessment <br />amount will not exceed benefit to the properties. If the report concludes the benefit to assessed properties is less <br />than the proposed preliminary assessment rate, Staff will then propose to lower the assessment rate accordingly <br />during the Assessment Hearing, which is scheduled for October 8, 2019. If the report verifies the assessment rate as <br />proposed is justified, Staff will propose to adopt the final assessment roll using the rate as preliminarily proposed. <br />This improvement project is listed in the City's current 10-year Capital Improvement Plan. <br />Public Comment <br />Staff conducted a public information meeting on Wednesday, November 7, 2018. The purpose of the meeting was <br />to present the proposed improvements, estimated costs, funding program, and preliminary project schedule to <br />
The URL can be used to link to this page
Your browser does not support the video tag.