My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/13/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:57:20 PM
Creation date
11/14/2018 8:53:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/13/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
760
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. INTRODUCTION <br />2.1 Authorization <br />The preparation of this report was authorized by the Ramsey City Council on August 28, 2018. <br />This project has been designated as City Improvement Project No. 19-03. <br />2.2 Program Overview <br />In support of the City's long-term Street Maintenance Program, the existing bituminous pavement <br />section will be reconstructed. Damaged concrete curb and gutter will be replaced and minor storm <br />sewer repairs will be made. Other appurtenant work will be completed as outlined in this report. <br />The City' s pavement evaluation process involves a visual evaluation of each street's pavement <br />surface based on the type, extent and severity of each pavement distress observed. Numerous types <br />of pavement distresses may exist within a pavement section including, but not limited to, alligator <br />cracking, block cracking, longitudinal cracking, transverse cracking, rutting, raveling, shoving, <br />potholes and patches. This field data is then used to rate the pavement condition. <br />The City uses the Pavement Surface Evaluation and Rating (PASER) system to rate pavement <br />condition. A PASER rating is a numerical index between 1 and 10 indicating the condition of a <br />pavement based on the various pavement distresses recorded during visual observations. A PASER <br />rating of 10 represents brand new pavement, while a PASER rating of 1 represents a pavement <br />section that has fallen into complete disrepair requiring full reconstruction. <br />In the summer of 2018, City Staff evaluated and rated the condition of the pavement along the <br />Wood Pond Hills and Chestnut Ridge street segments. A PASER rating of 2 was assigned to 146th <br />Avenue, Helium Street, and the northern half of Krypton Street. A PASER rating of 4 was assigned <br />to the southern half of Krypton Street, including its termini cul-de-sac. <br />2.3 Scope <br />City of Ramsey Improvement project 19-03 proposes to reconstruct the existing bituminous <br />pavement, to remove and replace damaged concrete curb and gutter sections, and to complete other <br />appurtenant work on three street segments within the Wood Pond Hills and Chestnut Ridge <br />residential neighborhood including; 146th Avenue between Nowthen Boulevard and Junkite Street, <br />Helium Street between Sunwood Drive and 146th Avenue, and Krypton Street from Sunwood <br />Drive to its termini cul-de-sc. These street segments total approximately 3,310 lineal feet (0.63 <br />miles) in length. <br />The existing bituminous pavement is proposed to be reconstructed using the Full Depth <br />Reclamation (FDR) process. This involves reclaiming the bituminous pavement section between <br />the existing concrete curb and gutter sections, along with the existing aggregate base, then hauling <br />and disposing of any excess reclaim material off site, spreading and compacting the remaining <br />reclaim material on top of the reshaped and compacted subgrade, then placing 3 Y/z -inches of new <br />Feasibility Report <br />Wood Pond Kills & Chestnut Ridge Street Reconstructions <br />City of Ramsey Project No. 19-03 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.