Laserfiche WebLink
4.8 Right -of -Ways / Easements <br />It is anticipated that all improvements will occur within existing City right-of-ways and/or <br />easements, with the possible exception of tying into private driveways and yards. It is therefore <br />not anticipated that the City will need to acquire additional permanent right-of-way or easements <br />for this project. As such, costs for right-of-way or easement acquisitions are not included in the <br />probable project costs. <br />City Staff will obtain required right of entries on a case by case basis. <br />Feasibility Report <br />Wood Pond Kills & Chestnut Ridge Street Reconstructions <br />City of Ramsey Project No. 19-03 <br />14 <br />