My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/13/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:57:20 PM
Creation date
11/14/2018 8:53:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/13/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
760
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19-03 WOOD POND HILLS & CHESTNUT RIDGE STREET RECONSTRUCTIONS <br />Preliminary Engineer's Estimate <br />Street Construction <br />Item Estimated <br />No. Description Unit Quantity Unit Cost Cost Extension <br />1 Mobilization LS 1 $ 9,000.00 $ 9,000.00 <br />2 Remove Concrete Curb and Gutter LF 750 $ 6.00 $ 4,500.00 <br />3 Remove Concrete Pavement - Driveways SF 80 $ 3.50 $ 280.00 <br />4 Remove Bituminous Pavement - Driveways SY 45 $ 8.00 $ 360.00 <br />5 Remove Bituminous Pavement SY 25 $ 8.00 $ 200.00 <br />6 Remove Concrete Valley Gutter SY 18 $ 20.00 $ 360.00 <br />7 Sawing Concrete Pavement - Full Depth LF 200 $ 4.00 $ 800.00 <br />8 Sawing Bituminous Pavement - Full Depth LF 300 $ 2.50 $ 750.00 <br />9 Common Excavation (EV) CY 20 $ 32.00 $ 640.00 <br />10 Subgrade Preparation RDST 33 $ 200.00 $ 6,600.00 <br />11 Subgrade Corrections LS 1 $ 50,000.00 $ 50,000.00 <br />12 Water MGAL 50 $ 35.00 $ 1,750.00 <br />13 Bituminous Pavement Reclamation (Full Depth) SY 10,286 $ 1.50 $ 15,429.00 <br />14 Mill Bituminous Pavement (2' width x 1.5" depth) SY 60 $ 15.00 $ 900.00 <br />15 Curing Compound for Existing Concrete Curb and LF 5,782 $ 1.15 $ 6,649.30 <br />Gutter <br />16 Haul and Dispose Bit Pavement Reclamation (LV) CY 1,200 $ 10.00 $ 12,000.00 <br />17 Bituminous Material for Tack Coat GAL 720 $ 2.50 $ 1,800.00 <br />18 Type SP 9.5 Wearing Course Mixture TON 849 $ 68.00 $ 57 732.00 <br />(SPWEA340C) (1.5") ' <br />19 Type SP 12.5 Non -Wearing Course Mixture TON 1,132 $ 60.00 $ 67 920.00 <br />(SPNWB330C) (2.0") ' <br />20 Type SP 9.5 Wearing Course Mixture TON 5 $ 68.00 $ 340.00 <br />(SPWEA340C) Driveways (2.0") <br />21 Adjust Valve Box EA 10 $ 250.00 $ 2,500.00 <br />22 Replace Broken Valve Box EA 5 $ 250.00 $ 1,250.00 <br />23 Adjust Frame and Ring Casting EA 15 $ 550.00 $ 8,250.00 <br />24 Concrete Curb & Gutter Design Surmountable LF 650 $ 25.00 $ 16,250.00 <br />25 Concrete Curb & Gutter Design B618 LF 100 $ 25.00 $ 2,500.00 <br />26 6" Concrete Driveway Pavement SY 9 $ 55.00 $ 495.00 <br />27 7" Concrete Valley Gutter SY 33 $ 85.00 $ 2,805.00 <br />28 Landscape Restoration LS 1 $ 1,500.00 $ 1,500.00 <br />29 Traffic Control LS 1 $ 2,000.00 $ 2,000.00 <br />30 Storm Drain Inlet Protection EA 13 $ 200.00 $ 2,600.00 <br />31 Common Topsoil Borrow (LV) CY 23 $ 50.00 $ 1,150.00 <br />32 Sodding Type Lawn SY 170 $ 18.00 $ 3,060.00 <br />Total Street Construction Cost $ 284,370.30 <br />5% Contingency Cost $ 14,218.52 <br />23% Indirect Cost $ 68, 675.43 <br />Total Street Project Cost $ 367,264.24 <br />Feasibility Report <br />Wood Pond Kills & Chestnut Ridge Street Reconstructions <br />City of Ramsey Project No. 19-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.