Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Project# 19-SEW-002 <br />Project Name Replace Pumps at Lift Station #6 <br />Description <br />Replace both pumps at lift station #6 16230 Iodine Street <br />I Justification <br />2019 thru 2028 <br />Total Cost $40,000 <br />Department Sewer Utility <br />Contact <br />Type Improvement <br />Useful Life 15 <br />Category Sewer Utility Improvement <br />Priority 3-Existing Obligation (Med) <br />Status Active <br />(Replace both pumps and base elbows due to normal wear By 2021, both pumps will need to be replaced to assure proper pumping and reliability <br />Expenditures 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Total <br />Improvements Other than 40,000 40,000 <br />Building Cost <br />Total 40,000 40,000 <br />Funding Sources 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Total <br />Sewer Utility Fund 40,000 40,000 <br />Total 40,000 40,000 <br />185 <br />