My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/27/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 11/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:57:56 PM
Creation date
11/26/2018 1:44:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/27/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program 2019 thru 2028 <br />City of Ramsey, Minnesota <br />Project# 17-STR-012 <br />Project Name 2025 Overlay Projects <br />Description <br />Total Cost $600,000 <br />Department Street Improvements <br />Contact <br />Type Improvement <br />Useful Life 20 Years <br />Category Street Improvement <br />Priority 3-Existing Obligation (Med) <br />Status Active <br />Repair, overlay and stripe concrete pavement on Sunwood Drive and Rhinestone Street in the COR Proposed improvements include repairing cracks, failing concrete joists and holes, as well as, <br />replacing all existing colored concrete crosswalks with high -early concrete and adding thermoplastic crosswalk markings, alsong with new pavement strtptng on both sides <br />I Justification <br />Numerous concrete pavement joints are failing resulting in stormwater runoff infiltrating into the pavement base, accelerating pavement deterioration due to staurated subgrade soils Numerous <br />holes also exist in the pavement allowing stormwater runoff into the pavement base These holes also present tnp hazards to pedestrians and most of the holes are located in pedestrian crosswalks <br />where colored concrete was used for enhanced delineation <br />Look at possibility of using MSA or PIR funds for portion of costs instead of bonding <br />Expenditures 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Total <br />Improvements Other than 600,000 600,000 <br />Building Cost <br />Total 600,000 600,000 <br />Funding Sources 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Total <br />Special Assessment - 150,000 150,000 <br />Bonded <br />GO Bonding (Road 450,000 450,000 <br />Funding) <br />Total <br />212 <br />600,000 600,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.