My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/27/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 11/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:57:56 PM
Creation date
11/26/2018 1:44:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/27/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program 2019 thru 2028 <br />City of Ramsey, Minnesota <br />Project# 04-WTR-017 <br />Project Name Water Treatment Facility <br />Description <br />(This project anticipates the construction of a 10 MGD ground water treatment plant <br />Justification <br />Total Cost $24,000,000 <br />Department Water Utility <br />Contact <br />Type Buildings <br />Useful Life 50 Years <br />Category Water Utility Improvement <br />Priority 5-Opportunity/Unfunded/Placeholder <br />Status Active <br />Int the 2012 Bolton & Menk Comprehensive Water System Study a water treatment facility was identified as a means of water supply This was intended to be a surface water treatment facility <br />that drew raw water from the Mississippi River After discussions with regulatory agencies, it was determined that there was the potential to provide more water to the system through the addtion <br />of wells In the 2017 report the treatment facility was removed <br />A new treatment facility was added to the 2017 report to provide greater water quality that exists from the untreated well water currently used in the City The construction of the facility will <br />depend on several factors, including needs of business and industrial users, and acceptability of the water by residents of the community The water treatment facility is being depicted as being <br />constructed in 2027 and 2028. The actual timing of the construction of the facility is undetermined at this time. <br />Expenditures 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Total <br />Building Cost/Construction 12,000,000 12,000,000 24,000,000 <br />Total 12,000,000 12,000,000 24,000,000 <br />Funding Sources 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Total <br />Water Utility Fund 12,000,000 12,000,000 24,000,000 <br />Total 12,000,000 12,000,000 24,000,000 <br />240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.