Laserfiche WebLink
CITY OF RAMSEY <br />2019 PROPOSED SCHEDULE OF RATES, FEES AND CHARGES <br />Page 16 of19 <br />SERVICE OR LICENSE <br />Bituminous Paving/Patching <br />Culverts <br />Road Improvement Assessment <br />Street Sweeping: Equipment Only: <br />Traffic Sign Replacement <br />Tobacco <br />SPECIAL NOTES <br />2018 Adopted 2019 Proposed <br />25.00/sq yard <br />Price+Tax <br />Per Policy <br />74.00/Hr <br />200.00 <br />Cigarette Sales (vending and over -the counter) <br />Cigarette Sales with age verification technology <br />E-Cigarette Sales <br />E-Cigarette Sales with age verification technology <br />Per Special Assessment Policy <br />Per FEMA Schedule of Equipment Rates <br />250.00 <br />150.00 <br />250.00 <br />150.00 <br />UTILITY RATES <br />Assessment Charge for Unpaid Items Assessed <br />Interest Rate on Unpaid Items Assessed <br />Penalty/late payment <br />Recycling Rates <br />Residential Curb -side Program fee/qtr <br />Sewer Rates <br />Residential/Single dwelling usage fee/qtr <br />Multi-family(apt) & commercial usage fee/qtr <br />Connection charge/res. equivalent <br />Connection charge/acre comm./ind. <br />Lateral Benefit Charges: Residential <br />Lateral Benefit Charges: Commercial <br />Administration fee <br />Past due on current billing <br />IPer Ace Contract <br />Street Lights <br />Developer contribution: <br />installation of Cobra street light <br />traditionaire subdivision street light (w/100 ft of wire) <br />New ROW COR Lights <br />street light 0 & M 3 year no, $98/year <br />Residential billing: <br />urban subdivision street light rate per lot (>7/92) <br />rural subdivision street light rate per lot <br />priority street light rate per residentiallapartment/ lot <br />Storm Water Management Rates <br />Residential <br />Commercial <br />30.00/account <br />5.50% <br />10% <br />8.85/qtr <br />Per 2016 Comprehensive Sewer Study 72.23 74.4 <br />72.23-F3.13/1000 gal. 74.40-F3.13/1000 gal. <br />in excess of 20,000 gal <br />Per 2012 & 2017 Comprehensive Sewer System Study 1,183.00 1,213 <br />Per 2012 & 2017 Comprehensive Sewer System Study 3,563.00 3,652 <br />Increased by construction cost index -Avg 3% since 2012 4,683.00 4,823 <br />Increased by construction cost index -Avg 3% since 2012 7,710.00 7,941 <br />Per Connexus Energy Fee Schedule <br />Developer Installed <br />Per Connexus Energy Fee Schedule <br />294/light <br />9.01/qtr <br />14.85/qtr <br />1.37/qtr <br />14.77/qtr 15.95/gtr <br />59.12/REU/qtr 63.80/REU/qtr <br />