Laserfiche WebLink
CITY OF RAMSEY Page 19 of 19 <br />2019 PROPOSED SCHEDULE OF RATES, FEES AND CHARGES <br />SERVICE OR LICENSE <br />Broken Hydrant Replacement - Winter <br />Connection charge/res. equivalent <br />Connection charge/res. Within Reimbursement Area <br />Connection charge/acre Comm./ind. <br />Lateral Benefit Charges: Residential <br />Lateral Benefit Charges: Commercial <br />SPECIAL NOTES � <br />Per 2012 & 2017 Comprehensive Water System Study <br />PER $6M Agreement with 21st Century Bank <br />Per 2012 & 2017 Comprehensive Water System Study <br />Increased by construction cost index -Avg 3% since 2012 <br />Increased by construction cost index -Avg 3% since 2012 <br />2018 Adopted <br />750.00 <br />1,763.00 <br />6,602.00 <br />5,982.00 <br />6,692.00 <br />2019 Proposed <br />4 <br />1,807.00 <br />6,601.00 <br />6,161.00 <br />6,893.00 <br />