My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/25/2018
Ramsey
>
Public
>
Agendas
>
Council
>
2018
>
Agenda - Council - 09/25/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:56:05 PM
Creation date
11/30/2018 9:32:18 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/25/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE <br />CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />8/28/2018 PROJECT ADDRESS SOUTHWEST CORNER OF BUNKER LAKE <br />BLVD AND JACKEL STREET NW <br />PROJECT. TITLE 18-130: BUNKER LAKE SECOND ADDITION FINAL PLAT AND SITE PLAN REVIEW <br />ESCROW # <br />DEPARTMENT: Community Development: Planning Division (Comprehensive Plan and Zoning Code) <br />Name: Eric Maass, Planning Consultant <br />TECHNICAL REVIEWER: Email: EMaass@wsbenir.com <br />Comments Requiring Plan Revisions: <br />1. Architectural plan sheets have been updated to indicate a 380 foot building width. Update all civil plan sheets <br />accordingly. <br />2. Continuous sidewalk must be provided along south side of Bunker Lake Blvd within the site area as well as the <br />western boundary along Jackel Street. <br />3. Color Building Elevations. Plan set indicated 5 different material colors. <br />General: The purpose of this file is to review a Final Plat and Site Plan for Bunker Lake Industrial Park Second Addition located <br />in the Bunker Lake Industrial Park south of Bunker Lake Blvd and west of Armstrong Blvd. The Developer, PSD, LLC, has <br />proposed to final plat one (1) lot which had previously been platted as Outlot A of Bunker Lake Industrial Park Addition. The <br />Property has been formerly used as a gravel mine/borrow pit. <br />This case is being reviewed per Chapter 117. Article II entitled Zoning and Chapter <br />117. Article III entitled Subdivisions. <br />Comprehensive Plan/Zoning: The Comprehensive Plan guides the subject <br />property for Business Park (BP) and is zoned E-3 Employment District. The proposed <br />subdivision is consistent with the Business Park Comprehensive Plan guidance and <br />the E-3: Employment zoning district. <br />Dimensional Standards for the E-3 Employment District: The following <br />standards apply to subdivisions in the E-3 Employment District. Lot 1 has a lot size <br />of 1.0 acres and a lot width of 200 feet. It appears that the subdivision meets all <br />applicable dimensional standards. <br />Standard <br />Re. ' -..-. <br />• . • .. .. Lot Size <br />• <br />Lot Width <br />.. Front Yard Setback <br />Rear Yard Setback <br />Side Yard Setback <br />Buildin • Hei • ht <br />Maximum Lot Covera • e <br />1.0 Acre <br />200 Feet <br />35 Feet <br />25 Feet <br />25 Feet <br />65 Feet <br />45% <br />The pyramid framework illustrates haw much discretioa the city has to make land use. decumus <br />based on the role it is playing. <br />Variances <br />Q� Conditional <br />Use Permits <br />SO <br />Subdivision Applications <br />Zoning/Subdivision <br />Ordinances <br />Comprehensive Plan <br />Lot 1 is proposed to be occupied by a 60,800 square foot and 31 foot 6 inch tall building that appears to be designed for light <br />industrial or warehouse uses. Potential occupancy classifications listed on the plan set include B-Office, F-1, F-2 Manufacturing, <br />
The URL can be used to link to this page
Your browser does not support the video tag.